My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29 112TH ST SW 2020-05-22
>
Address Records
>
112TH ST SW
>
29
>
29 112TH ST SW 2020-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2020 8:48:26 AM
Creation date
5/22/2020 8:47:19 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
29
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/16/2019 Page 2 <br /> City of Everett <br /> 10:34:33AM <br /> INSPECTION ACTIVITY REPORT <br /> 12/2/2015 12/2/2015 Final Plbg DXW Corr Reqd See notes PRV required on pressure over 80 PSI. <br /> Relief line outside must be 6"to 24"off <br /> finished grade. <br /> Caulk around plumbing pipe under <br /> cabinets. <br /> Bollard required at hot water tank. <br /> Secure all hose bibs. <br /> Insulate water lines in garage. <br /> 12/4/2015 12/4/2015 Final Mech DXW Note:Duct test left <br /> at site <br /> 12/4/2015 12/4/2015 Final Plbg DXW Approval See notes Plumbing Final OK as noted: Caulk around <br /> old relief line hole and new one and under <br /> sink on 1st floor. <br /> 12/8/2015 12/8/2015 GasPipeFinal DXW Approval OK'd on 12-2-15 <br /> 12/8/2015 12/8/2015 Final Bldg KMK Corr Reqd See notes 1)Need grippable handrail to code at front <br /> entry. <br /> 2)Need 3/8 lags staggered into ledger at <br /> front porch 16"o.c. <br /> 3)Need splash blocks at downspouts. <br /> 4)Missing 2nd level deck at slider door. <br /> 5)Need blower door test&Insulation <br /> Certificate. <br /> 10:20 a.m. <br /> 12/15/2015 12/15/2015 Final Bldg KMK Con Reqd See notes 1)Top of handrail to be 34"-38"(currently <br /> at 44"). <br /> 2)Address not filled out on panel regarding <br /> energy compliance certificate. Please fill <br /> out&sign energy compliance form(left on <br /> counter). <br /> 3)House address is missing. <br /> 8/25/2016 Letter MEM Expired,14 days <br /> grace period <br /> 9/9/2016 12/12/2018 Consultation KMK CORRECTION See notes Spoke on phone-work in progress <br /> 9/21/2016 9/21/2016 Final Bldg KMK Approval <br /> 2/26/2019 2/26/2019 PLANNING FINAL SRI CORRECTION Need stream buffer Per email from Steve Ingalsbe,Final CO sill <br /> plants not be issued until the stream buffer plants <br /> are in. <br /> 2/26/2019 2/26/2019 CERTIFICATE OF TKJ CORRECTION Need Planning final <br /> OCCUPANCY <br /> 5/16/2019 5/16/2019 ADMIN OTHER KLC OTHER OK to archive <br /> without C of 0 per <br /> T.J. <br /> INSP12 CRWsYs TEM S <br />
The URL can be used to link to this page
Your browser does not support the video tag.