My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
332 MADISON ST B 2020-05-22
>
Address Records
>
MADISON ST
>
332
>
332 MADISON ST B 2020-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2020 11:36:30 AM
Creation date
5/22/2020 11:36:08 AM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
332
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/18/2020 Page 1 <br /> City of Everett <br /> 10:5q:32AM e <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1903-013 Site Address 332 MADISON ST <br /> Applied 3/26/2019 Applicant SCHNEK GARIN Lot <br /> Approved 5/13/2019 Owner HOUGHTON JAMES M Block <br /> Issued 5/21/2019 Contractor ICON CONST&RESTORATION LLC Tract <br /> Parent Permit No. Description CONVERT SFR&GARAGE TO A DUPLEX BY CONNECTING <br /> Notes (3/26/2019 3:08 PM TAH) <br /> WITH NEW GARAGE <br /> (5/9/2019 9:07 AM TRN) <br /> PERMIT CONDITIONS: 1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 5/22/2019 5/22/2019 PLUMB SDP PARTIAL APPR (5/21/2019 1:33 PM TAH) <br /> 03-ROUGH IN REQUESTED BY JIM DANDY SEWER& <br /> PLUMBING <br /> (5/22/2019 2:48 PM SDP) <br /> Plumbing rough of existing SFR is ok, <br /> recall for the garage piping when you are <br /> ready. <br /> Note:dishwasher will require an airgap at <br /> final. <br /> 6/19/2019 6/19/2019 MECH 06-FINAL DXW NOT READY <br /> 6/19/2019 6/19/2019 GAS 01-ROUGH IN DXW NOT READY (6/19/2019 2:47 PM DXW) <br /> complete gas pipe to hot water tank. <br /> 8/16/2019 8/16/2019 GAS 01-ROUGH IN DXW CORRECTION 206-502-8094 <br /> (8/16/2019 12:56 PM DXW) <br /> on a 100 p.s.i.test gauge 20 p.s.i.will be <br /> req.for test <br /> 8/16/2019 8/16/2019 PLUMB DXW OTHER <br /> 01-CONSULTATIO <br /> 8/19/2019 8/19/2019 PLUMB SDP PARTIAL APPR 425-232-3842 <br /> 03-ROUGH IN <br /> (8/19/2019 3:28 PM SDP) <br /> 1)Underfloor waste/water for new unit is <br /> ok to cover. <br /> 2)Recall for sewer connection of the <br /> building drain.Per the approved plans and <br /> UPC-311.1,it is ok to connect the new <br /> sewer line to the existing sewer. <br /> 8/19/2019 8/19/2019 BLDG DWF NOT READY 425-232-3842 <br /> 01-CONSULTATIO <br /> (8/19/2019 2:39 PM DWF) <br /> Need mechanical and plumbing rough in <br /> sign off before building framing inspection. <br /> 8/21/2019 8/21/2019 BLDG DWF PARTIAL APPR 425-232-3842 Britch <br /> 01-CONSULTATIO <br /> (8/21/2019 10:37 AM DWF) <br /> Underfloor framing-ok to insulate. <br /> 8/21/2019 8/21/2019 BLDG DWF PARTIAL APPR 425-232-3842 Subfloor framing <br /> 08-FRAMING <br /> (8/21/2019 10:59 AM DWF) <br /> Underfloor framing-ok to insulate <br /> 8/22/2019 8/22/2019 BLDG DWF PARTIAL APPR 425-232-3842 <br /> 11-INSULATION Underfloor insulation <br /> (8/22/2019 10:27 AM DWF) <br /> Underfloor insulation,ok to cover. <br /> INSP12 CAWS YS TE MS <br />
The URL can be used to link to this page
Your browser does not support the video tag.