My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
332 MADISON ST B 2020-05-22
>
Address Records
>
MADISON ST
>
332
>
332 MADISON ST B 2020-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2020 11:36:30 AM
Creation date
5/22/2020 11:36:08 AM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
332
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/18/2020 page 2 <br /> 10:5932AM4 City of Everett <br /> 4 <br /> INSPECTION ACTIVITY REPORT �' <br /> 8/26/2019 8/26/2019 MECH 04-ROUGH DXW PARTIAL APPR See notes for Unit A Phone:206-502-8094 <br /> IN only B-vent for hot water tank to have 1" <br /> clearance at roof from combustable- <br /> insulation shield required at B-vent in attic. <br /> Proper combustion air required for hot <br /> water tank. <br /> B-vent on roof for hot water tank to be 2' <br /> above air intake for furnace on roof. <br /> Duct in crawl not hooked up-open to <br /> crawl. <br /> Insulation on duct must be R-8 required. <br /> Hot water tank relief line to have proper <br /> grade in crawl and propertly supported <br /> pipe. <br /> EXISTING FIREPLACE CANNOT BE <br /> USED AS FUNCTIONING FIREPLACE. <br /> 8/26/2019 8/26/2019 • GAS 01-ROUGH IN DXW PARTIAL APPR See notes for Unit A Phone:206-793-0557 <br /> only <br /> Unit A(existing house)rough in gas piping <br /> ok. 15 psi <br /> Label meters <br /> 8/30/2019 8/30/2019 PLUMB 06-FINAL SDP PARTIAL APPR For existing house <br /> only <br /> 8/30/2019 8/30/2019 MECH 06-FINAL SDP PARTIAL APPR For existing house <br /> only <br /> 8/30/2019 8/30/2019 GAS 03-FINAL SDP PARTIAL APPR for existiiing house <br /> only <br /> 9/4/2019 9/4/2019 PLUMB SDP APPROVAL 425-232-3842 Rich <br /> 02-GROUND <br /> (9/4/2019 2:51 PM SDP) <br /> waste and water lines under the slab for the <br /> new garage.Ground work complete. <br /> 9/5/2019 9/5/2019 BLDG 14-OTHER BDGI OTHER no inspection needed 425-232-3842 <br /> Slab inspection <br /> 11/18/2019 11/18/2019 PLUMB SDP CORRECTION Unit B(new 425-232-3842 <br /> 03-ROUGH IN addition) <br /> (11/18/2019 2:20 PM SDP) <br /> 1)The waste and vents are not on test. <br /> 2)The waste pipe in the crawl space under <br /> the original house looks backgraded,no <br /> fall. <br /> 3)The T&P drain line for the water heater <br /> must be piped,per code, to the outside at <br /> final. <br /> 11/26/2019 11/26/2019 GAS 01-ROUGH IN SDP APPROVAL (425)232-3842 <br /> 11/26/2019 11/26/2019 MECH 04-ROUGH SDP NOT READY (425)232-3842 <br /> IN <br /> (11/27/2019 7:30 AM SDP) <br /> 1)Complete the stove,dryer and exhauat <br /> fans. <br /> 2)B-vent must have a 1"clearance to <br /> combustibles,remove the roof sheeting <br /> around the b-vent. <br /> 11/26/2019 11/26/2019 PLUMB SDP APPROVAL (425)232-3842 <br /> 03-ROUGH IN <br /> 12/11/2019 12/11/2019 BLDG DWF NOT READY need mech,elec 425-232-3842 <br /> 08-FRAMING finals prior to <br /> framing <br /> 12/11/2019 12/11/2019 MECH 04-ROUGH DXW CORRECTION Butch <br /> IN 425-232-3842 <br /> (12/11/2019 12:16 PM DXW) <br /> as noted maintain 1 in.clearance at B-vent <br /> thru roof and sheetrock ceiling. <br /> 12/17/2019 12/17/2019 BLDG KMK APPROVAL 425-232-3842 <br /> 08-FRAMING <br /> 12/18/2019 12/18/2019 BLDG KMK APPROVAL Garin:425-232--3842 <br /> 11-INSULATION <br /> INSP12 CRIV YS TEM S <br />
The URL can be used to link to this page
Your browser does not support the video tag.