My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Utility Accomodation WA ST Dept of Ecology
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Utility Accomodation WA ST Dept of Ecology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:17 AM
Creation date
6/1/2020 11:59:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
5/20/2020
Council Approval Date
5/13/2020
End Date
11/9/2036
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Utility Accomodation 2020-0858
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 Washington State <br /> Department of Transportation Utility Facility Description <br /> All Greyed Out Areas are For Department Use Only Accommodation Number: <br /> State Route Number: 5 SnagMP (Link) Access Control: Scenic Class: <br /> Begin Mile Post: 194.85 End Mile Post: 194.85 T, R,Sec: <br /> Facility Description -Provide a summary of the proposed work: (press ALT+Enter to insert line break) <br /> Repairing an existing 8-inch water main that crosses the Snohomish River via Bridge 5/645W, and reattaching the support brackets to the bridge pier <br /> where existing concrete anchors have failed. <br /> Additional Notes: <br /> Remarks and Installation <br /> Offset Distances (feet) Facility Description Right of Way (IA o Comments <br /> Aerial, <br /> Left, From Buried, 0 1) Indicate where item enters/leaves <br /> Begin End Right Facility to be Installed/ <br /> Mile Mile g From Edge of Depth Bridge U R/W. 2) Include pertinent topography <br /> or Deactivated/Upgraded = <br /> a) mu' info(turnouts, Rd. approaches, <br /> Center Traveled or Left Right or a) <br /> Post Post (indicate size and/or diameter, Surface j 0 i <br /> Xingntersections, culvert,guardrail,xing <br /> Line Way Height <br /> and material) Q method, split grade/under/overpass, <br /> (Fogline) etc.) <br /> 194.85 198.85 Left 29 -3 8-in DI Pipe and achorages 55 55 Bridge Enters ROW from ground, and <br /> to concrete bridge pier up bridge pier 2-W. <br /> . Suspended under bridge <br /> DOT Form 224-697 <br /> Rev. 08/2019 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.