My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD SNO ISLE SKILL CTR EXPANSION 2009 Geotech Report 2018-01-02 MF Import
>
Address Records
>
AIRPORT RD
>
9001
>
SNO ISLE SKILL CTR EXPANSION 2009
>
Geotech Report
>
9001 AIRPORT RD SNO ISLE SKILL CTR EXPANSION 2009 Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:27:51 PM
Creation date
6/3/2020 7:09:48 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Tenant Name
SNO ISLE SKILL CTR EXPANSION 2009
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I Subsurface Exploration, Geologic Nazard, and <br /> Sna/sle Skil(s Center Addition Preliminary Geotechnica!Engineering Repon <br /> �erert Washington Preliminary Design Recommendat� <br /> I 17.0 PROJECT DESIGN AND CONSTRUCTION MONITORING <br /> I Our recommendations aze prel'uninary in that construction details have not been finaliztd at the <br /> time of this report. We aze available to provide additional geotechnical exploration and <br /> consultatior as the project design develops and possibly changes from that upon wluch tlris <br /> report is based. We recommend that AESI perform a geotechnical review of the plaas prior to <br /> � fmal design completion. In this way, our earthwork and foundation recommendations may be <br /> properly interpreted and implemented in the design. <br /> iWe aze also available to provide geotechnical engineering and monitorr; services during <br /> I construction. The integrity of the foundations and associated stiactures depends on proper site <br /> prepazation and construction procedures. In addition, engineering decisions may have to be <br /> made in the field in the event that vaziations in snbsurface conditions become appuent. <br /> IWe have enjoyed working with you on this study aud ue confident that these recommendations <br /> will aid in the successful completion of your project. If you should have any questions ar <br /> Irequire futther assistance, please do not hesitate to call. <br /> Sincerely, <br /> IASSOCIATED EARTH SCIENCES, INC. � �qFR/� <br /> Everett, Washington ¢�e��F W�sy�HC 9 <br /> I ,- � <br /> 2 '� <br /> r <br /> , v3 <br /> � ���'3�`"�� <br /> SioN,�.� <br /> I ��'L"✓`- � E%Pine311/20/ <br /> I Edwazdo Garcia, P.E. Kur[D. Merriman, P.E. <br /> Project Engineer Principal Engineer <br /> IAttachments: Figure 1: Vicinity Map <br /> Figure 2: Site and Explotation Plan <br /> i Figure 3: Typical Wall-Footiog Drain Detail <br /> Appendix: Exploration Logs <br /> ILaboratory Testing <br /> � <br /> I <br /> June 11, 2008 ASSOCfATED EARTf1 SCIENCES, lNC. <br /> IEG/Id-EE090213A5-Prolecft120 0802/31EEIWP Page 19 �t <br />
The URL can be used to link to this page
Your browser does not support the video tag.