My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 If, after planing a thin veneer layer remains, the contractor shall replane the roadway as <br /> 2 directed by the Engineer, paid under"Additional Planing Bituminous Pavement". The <br /> 3 Contractor shall adjust their schedule at no additional cost to the owner. <br /> 4 <br /> I <br /> 5 The planings shall become the property of the Contractor and shall be removed from the <br /> 6 right-of-way. The planings may be utilized as RAP, within the requirements of Section 5-04.2 <br /> 7 or 9-03.21. The Contractor shall immediately dispose of all other debris resulting from the <br /> I 8 planing operation in a Contractor-provided site off the right-of-way. <br /> 9 <br /> 10 Immediately after grinding, the Contractor shall construct an asphalt transition (temporary <br /> 11 paper joints or ramps), on all traveled ways, wheelchair ramps, and exposed manholes, <br /> 12 inlets, catch basins, monuments, valve boxes, and other structures on the street, regardless <br /> 13 of depth in grinding.Asphalt transition must be removed prior to overlay. Cast iron structures <br /> I14 15 left higher than 2" must be removed and steel plates installed to protect the opening and <br /> provide a suitable driving surface. <br /> 16 <br /> I <br /> 17 18 Sweeping of roadway surface shall immediately follow all grinding. Sweeping of roadway <br /> surface is required prior to tack placement and paving. <br /> 19 <br /> 20 The road shall be overlayed within 3 working days after planing operation for streets <br /> I <br /> 21 without loops. On streets where loops will be replaced, the overlay shall be completed within <br /> 22 8 working days after planing operation. <br /> 23 <br /> I 24 Sweepers following the grinding work will not be paid separately, and is included in the bid <br /> 25 item "Planing Bituminous Pavement (2" Deep)", per square yard. <br /> 26 <br /> I <br /> 27 28 For mainline planing operations, the equipment shall have automatic controls, with sensors <br /> for either or both sides of the equipment. The controls shall be capable of sensing the proper <br /> 29 grade from an outside reference line, or a mat-referencing device. The automatic controls <br /> I 30 shall also be capable of maintaining the desired transverse slope. The transverse slope <br /> 31 controller shall be capable of maintaining the mandrel at the desired slope (expressed as a <br /> 32 percentage) within plus or minus 0.1 percent. <br /> I 33 <br /> 34 Pre-level course is not anticipated on any of the selected streets. If, however, after plaining <br /> 35 operations, drivability issues cannot be resolved with 2" overlay, pre-level will be required as <br /> 36 directed and paid for by "HMA Class 1/2" PG 64-22", per ton. Contractor is strongly <br /> I37 encouraged to bid the work to cover their cost of pre-level operations. <br /> 38 <br /> I 39 5-04.3(14)A Paving and Planing Under Traffic <br /> 40 <br /> 41 5-04.3(14)A1 General <br /> I 42 In addition the requirements of Section 1-07.23 and the traffic controls required in Section 1- <br /> 43 10, and unless the Contract specifies otherwise or the Engineer approves, the Contractor <br /> 44 must comply with the following: <br /> I45 <br /> 46 1. Intersections: <br /> I 47 a. Keep intersections open to traffic at all times, except when paving or planing <br /> 48 operations through an intersection requires closure. Such closure must be kept to <br /> 49 the minimum time required to place and compact the HMA mixture, or plane as <br /> 50 appropriate. For paving, schedule such closure to individual lanes or portions <br /> I 51 thereof that allows the traffic volumes and schedule of traffic volumes required in <br /> 52 the approved traffic control plan. Schedule work so that adjacent intersections are <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 63 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />