My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8-09.4 Measurement <br /> 2 <br /> 3 Section 8-09.4 is supplemented with the following: <br /> 4 <br /> 5 Measurement of markers will be per hundred for markers furnished and in place. <br /> 6 <br /> 7 8-09.5 Payment <br /> 8 <br /> 9 Section 8-09.5 is supplemented with the following: <br /> 10 <br /> 11 Payment will be made in accordance with section 1-04.1, for the following Bid item included <br /> 12 in the Proposal: <br /> 13 <br /> 14 "Raised Pavement Marker Type 2", per hundred. <br /> 15 <br /> 16 <br /> 17 GLF 8-13.DOCX <br /> 18 8-13 MONUMENT CASES <br /> 19 <br /> 20 Section 8-13 of the standard specifications is deleted and replaced by the following: , <br /> 21 <br /> 22 (******) <br /> 23 8-13.1 Description <br /> 24 <br /> 25 This work will consist of adjusting existing survey monument cases to grade in accordance <br /> 26 with Standard Drawing No. 323 and these Special Provisions. <br /> 27 <br /> 28 8-13.2 Vacant <br /> 29 <br /> 30 8-13.3 Construction Requirements <br /> 31 <br /> 32 Existing monument castings shall be adjusted to grade in the same manner as for manholes <br /> 33 in Section 7-05.3(1) of these Special Provisions. <br /> 34 <br /> 35 8-13.4 Measurement <br /> 36 <br /> 37 Measurement of monument case and cover will be by the unit for each monument case and <br /> 38 cover adjusted to grade. <br /> 39 <br /> 40 8-13.5 Payment <br /> 41 <br /> 42 Payment will be made for the following bid items when included in the proposal: <br /> 43 <br /> 44 "Adjust Existing Monument Castings to Grade," per each; <br /> 45 <br /> 46 The unit contract price for"Adjust Existing Monument Casing to Grade"shall include all costs <br /> 47 to adjust the casting to finished grade. I <br /> 48 <br /> 49 <br /> i <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 70 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.