My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 1 <br /> 2 <br /> 3 DIVISION8.GR8 <br /> 4 Division 8 <br /> I5 Miscellaneous Construction <br /> 6 <br /> 7 CNH 8-09.DOCX <br /> 1 8 8-09 RAISED PAVEMENT MARKERS <br /> 9 (******) <br /> 10 <br /> I11 8-09.1 Description <br /> 12 <br /> 13 Section 8-09.1 is supplemented with the following: <br /> I 14 <br /> 15 At locations called for in the Appendices to the Special Provisions, the Work shall consist of <br /> 16 installing white and yellow pavement markers between skip lines or on centerline at 40' <br /> 17 centers. Raised pavement markers shall meet the requirements of Section 8-09 and City of <br /> 18 Everett Standard Drawing 720. <br /> 19 <br /> I <br /> 20 21 At locations staked by the engineer, the Work shall consist of installing blue pavement <br /> markers at each fire hydrant adjacent to the nearest yellow paint line, on the side of the line <br /> 22 that the hydrant is closest. Where multiple yellow lines exist, such as two way left turn lane <br /> I 23 lines or painted islands, only one marker will be installed adjacent to the nearest yellow paint <br /> 24 line. <br /> 25 <br /> I 26 8-09.2 Materials <br /> 27 <br /> 28 Section 8-09.2 is supplemented with the following: <br /> I 29 <br /> 30 White and yellow Raised Pavement Marker (RPM) Type 2 shall be selected from approved <br /> 31 materials listed in the WSDOT Qualified Products List. <br /> 32 <br /> III 33 Blue Raised Pavement Marker (RPM) Type 2 shall be bi-directional blue-blue with abrasion <br /> 34 resistant lens or coating and shall be one of the following: <br /> 35 1. 3M Series 290 Model 295-2B <br /> I <br /> 36 2. Stimsonite Model 911-AB <br /> 37 <br /> 38 8-09.3 Construction Requirements <br /> I 39 <br /> 40 Section 8-09.3 is supplemented with the following: <br /> 41 <br /> I 42 8-09.3(5)Asphalt Adhesives <br /> 43 <br /> 44 Section 8-09.3(5) is supplemented with the following: <br /> I 45 <br /> 46 Adhesive for blue raised pavement markers on all hot mix asphalt surfaces shall be <br /> 47 bituminous conforming to the requirements of Section 9-02.1(8) and be Crafco #34269 <br /> I 48 or approved equal, or, shall be Flint Premark Bundy Adhesive #8430055BK 5" by 5" <br /> 49 installed per manufacturer's recommendations. <br /> 50 <br /> 1 <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 69 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.