Laserfiche WebLink
I <br /> 1 Loops that fail the tests, as described above, and are replaced shall be installed in <br /> 2 accordance with current City of Everett design standards and Standard Drawings, <br /> 3 as determined by the Engineer. <br /> 4 <br /> 5 If traffic signal loops that fail the tests, as described above, are not replaced and 1 <br /> 6 operational within 5 working days, the Contractor shall install and maintain interim <br /> 7 video detection until the replacement loops are operational. The type of interim <br /> 8 video detection furnished shall be approved by the Engineer prior to installation. II <br /> 9 <br /> 10 GLF 8-20.4.DOCX <br /> 11 8-20.4 Measurement <br /> 12 <br /> 13 Section 8-20.4 is supplemented with the following: <br /> 14 1 <br /> 15 (******) <br /> 16 "Vehicle Loop Detectors", for both loop perimeter and home run, shall be measured by the I <br /> 17 linear foot of the neat sawcut line in place in the roadway. No additional measurement will be <br /> 18 made for the installation of lead-in conduit and shall be included in the measurement <br /> 19 I 20 "Loop Detector Lead-In Cable" shall be measured by the linear foot of the neat line of conduit <br /> 21 between the controller cabinet and loop splice. No additional measurement will be made for <br /> 22 coiled loop detector cable in junction boxes or cabinets. <br /> 23 I <br /> 24 "Conduit Pipe 2 In. Diam." shall be measured by the linear foot of the neat line of conduit <br /> 25 between the junction box and the curb line. No additional measurement will be made for <br /> 26 sweeps or elbows in junction boxes or at the curb line. I <br /> 27 <br /> 28 GLF 8-20.5.DOCX <br /> 29 8-20.5 Payment I 30 <br /> 31 Section 8-20.5 is supplemented with the following: <br /> 32 1 <br /> 33 (******) <br /> 34 "Vehicle Loop Detectors," per linear foot. I <br /> 35 <br /> 36 The unit contract price shall include saw cutting, cleaning and drying of pavement, installing <br /> 37 loops and home runs, loop lead-in conduits, loop wire, sealant, splice kit and splicing between <br /> 38 loop wire and lead-on cable, any work necessary to access a junction box and testing of the <br /> 39 vehicle detectors as defined in Section 8-20.3(14)D. <br /> 40 <br /> 41 No payment shall be made for any loops that are not spliced and fully operational, including <br /> 42 any loop detector lead in cable required to make the loop operational. <br /> 43 <br /> 44 "Loop Detector Lead-In Cable", per linear foot. <br /> 45 <br /> 46 The unit contract price shall be full pay for furnishing and installing each loop detector lead- <br /> 47 In cable in existing conduits between the traffic signal control cabinet and loop splice point, <br /> 48 including all and all other Work necessary terminate loop lead in cable at either end. <br /> 49 <br /> 50 No payment shall be made for any detector lead-in cable that is not spliced and fully <br /> 51 operational, including any testing required to make the loop operational. <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 74 OF 79 SPECIAL PROVISIONS I <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />