My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8-22.5 Payment <br /> 2 <br /> 3 Section 8-22.5 is supplemented read as follows: <br /> 4 <br /> 5 (******) <br /> 6 "24" Plastic Crosswalk Line", per Linear Foot. <br /> 7 <br /> 8 "24" Plastic Stop Line", per Linear Foot. <br /> 9 <br /> 10 <br /> 11 CNH 8-23.DOCX <br /> 12 8-23 TEMPORARY PAVEMENT MARKINGS <br /> 13 ,14 8-23.2 Materials <br /> 15 <br /> 16 Section 8-23.2 is supplemented read as follows: ' <br /> 17 <br /> 18 (*****w) <br /> 19 Materials for temporary markings shall be paint or reflectorized aluminum tape, as directed <br /> 20 by the Engineer and selected from approved materials listed in the Qualified Products List. <br /> 21 <br /> 22 Temporary paint shall be used on subsurface pavements and may be paved over. Should <br /> 23 sudden inclement weather create a pavement too wet to install temporary paint, temporary <br /> 24 flexible raised pavement markers shall be installed on 40' intervals as directed by the <br /> 25 Engineer. Temporary flexible raised pavement markers shall be selected from approved <br /> 26 materials listed in the Qualified Products List. Temporary flexible raised pavement markers <br /> 27 shall be nailed to the subsurface pavement and removed prior to paving. Reflectorized <br /> 28 aluminum tape shall be used on new pavement and removed during permanent marking <br /> 29 application <br /> 30 <br /> 31 8-23.5 Payment <br /> 32 <br /> 33 Section 8-23.5 is supplemented read as follows: <br /> 34 <br /> 35 (.,-..) <br /> 36 Temporary Pavement Marking will be paid for under bid item "Temporary Pavement <br /> 37 Markings" per linear foot. This shall be full pay for constructing, maintaining, and removing <br /> 38 temporary lines and markers as specified. No additional compensation will be allowed when <br /> 39 Contractor is required to repair temporary markings that have been damaged or worn. <br /> 40 <br /> 41 GKK 8-26.DOCX <br /> 42 8-26 RESOLVE ABOVE GROUND CONFLICTS <br /> 43 (******) <br /> 44 <br /> 45 Section 8-26 is vacant and is replaced with the following: <br /> 46 <br /> 47 8-26.1 Description <br /> 48 <br /> 49 This work consists of resolving unanticipated above ground conflicts to conform to the <br /> 50 Project requirements due to construction, where they are not addressed by the <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 78 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.