I <br /> 1 Personnel performing the field layout and preliminary spotting shall be proficient in <br /> I <br /> 2 the practice of striping layout, including layout and preliminary spotting of curves <br /> 3 and tapers using a rope and paint wand, proper annotation on the pavement of <br /> 4 starts, stops, and changes in line type for pavement markings, and an <br /> I 5 understanding of WSDOT Standard Plans and City Standard Drawings for <br /> 6 pavement markings. <br /> 7 <br /> I 8 9 Survey personnel performing the calculations, notes, and layout data shall be on <br /> site to answer questions regarding the layout notes as the roadway is being spotted <br /> 10 or shall perform the work. In the event a revision is required by the Contracting <br /> II 1 Agency during field layout, either to correct errors in the notes or to make minor <br /> 12 revision noted in the ordinary progress of the work, field layout shall be performed <br /> 13 by the Contractor at the time. <br /> I 14 <br /> 15 All field layout and temporary pavement marking shall be completed during the <br /> 16 same shift as the striping is obliterated by grinding or paving unless otherwise <br /> 17 directed by the Engineer. <br /> I 118 <br /> 19 Permanent pavement marking shall not begin until the layout is approved by the <br /> 20 Contracting Agency. Such approval shall not relieve the Contractor of responsibility <br /> I <br /> 21 for the accuracy of the field markings. <br /> 22 <br /> 23 Payment <br /> I 24 <br /> 25 All costs associated with layout of temporary striping shall be included in the <br /> 26 associated bid items for pavement marking and shall be full pay for all labor, <br /> I 27 equipment, materials, and supervision utilized to perform the Work specified for <br /> 28 layout and preliminary spotting of pavement markings, including any resurveying, <br /> 29 checking, correction of errors, replacement of missing or damaged markings, and <br /> I 30 coordination efforts. <br /> 31 <br /> 32 8-22.3(2) Preparation of Roadway Surfaces <br /> I 33 <br /> 34 Section 8-22.3(2) is supplemented with the following: <br /> 35 <br /> 36 (,< ,.) <br /> I 37 Apply materials to new HMA that is sufficiently cured according to the manufacturer's <br /> 38 recommendation. Permanent paint marking material applied to new HMA require a <br /> 39 pavement cure period of at least 21 days. Permanent Type D marking material applied <br /> 40 to new HMA require a pavement cure period of at least 10 days. <br /> 41 <br /> 42 8-22.4 Measurement <br /> 111 <br /> 43 <br /> 44 Section 8-22.4 is supplemented read as follows: <br /> 45 <br /> I46 (******) <br /> 47 The measurement of crosswalk line and stop line will be based on the linear foot of 24" wide <br /> I 48 marking installed. <br /> 49 <br /> 50 The measurement of aerial survey marker and access parking space symbol will be per each <br /> I 51 for each marker installed. <br /> 52 <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 77 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />