My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> • <br /> • <br /> BID.PROPOSAL I <br /> CITY OF EVERETT,WASHINGTON I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY <br /> W.O. 3727 I <br /> Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs <br /> between the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be I <br /> corrected to conform thereto. All entries must be typed or entered in ink. <br /> BIDDER NAME GRANITE CONSTRUCTION COMPAN' <br /> • <br /> BASE BID • I <br /> SCHEDULE A-MULTIPLE CITY STREETS <br /> I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) 1 <br /> 1. 1 Mobilization $ ZI ?/ $ 2I31�or..) . - <br /> Lump Sum Per L.S. ..,_ I <br /> 2. 4,797 Flaggers(Minimum Bid $ 9 , $ q�-f� (ZI . 02- <br /> Hour Prevailing Wage) Per Hour 111 <br /> 3. 1 Project Temporary Traffic $ ��I OM . $ ct3/Jr Quo . •d� <br /> Lump Sum Control Per L.S. I <br /> 4. 15,533 HMA Class 1/2 Inch, PG 64- $ taA00 $ 1 126'i l7 3 . <br /> Ton 22 Per Ton I <br /> 5. 102 Adjust Manhole to Grade $ (00 . $ tOl 2-UO ,0-- , <br /> Each Per Each <br /> 6. 64 Adjust Catch Basin/Inlet to $ /60 . $ (4 l0 . <br /> Each Grade Per Each <br /> 7. 72 Adjust Valve Box to Grade $ l GO $ 1 2 . :—Q-- 1 <br /> Each Per Each • <br /> ciO <br /> 8. 25 Adjust Existing Monument $ I v .% <br /> V $ Z GJ (,Zj I <br /> Each Castings to Grade Per Each <br /> I <br /> I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY SCHEDULE A DIVISION P <br /> WORK ORDER 3727 FEBRUARY 20,2020 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.