My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i , . <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> 9. 115,746 Planing Bituminous $ :, • ( $ 3 I�� !—�• <br /> I Square Yard Pavement(2"Deep) Per S.Y. <br /> 10. 34,724 Additional Planing $ � �l $ ', � Q. <br /> t . �J <br /> ISquare Yard Bituminous Pavement Per S.Y. <br /> 8,250 Vehicle Loop Detectors $ ' .) • $ 1 Z-s �50•Iii. Linear Foot Per L.F. <br /> 12. 690 Loop Lead-In Detector Cable $ (713 <br /> 6 . $ 3 i 1) • " <br /> ILinear Foot Per L.F. <br /> v0 <br /> 13. 120 Conduit Pipe,Z"Diameter $ (\ • . --- $ ( ( `b20 • -r"_� <br /> ILinear Foot Per L.F. <br /> �1 q r� <br /> 14. 109,130 Temporary Pavement $ ( )• $ M. `73 / <br /> Linear Foot Markings Per L.F. • <br /> I 15. 920 Plastic Wide Line $ r I • _ $ 31 060 • ---- <br /> Linear Foot Per L.F. <br /> 16. 56 Plastic Traffic Arrow $ _0O • � $ t 20 1 1O •-- <br /> ' Each Per Each <br /> W c� <br /> 17. 2,130 24"Plastic Crosswalk Line $ ( 4-- • $ 2SJ 5(et •--~" <br /> ILinear Foot Per L.F. <br /> I 18. 710 24"Plastic Stop Bar $ tZ •�— $ 5r52O .----- <br /> Linear Foot Per IX. <br /> I 19. 3,045 Paint Line $ $ 2 r5 <br /> Linear Foot Per L.F. <br /> 20. 70,495 Plastic Line $ i $1 Ui Li'7 • <br /> ILinear Foot Per L.F. <br /> 21. 15 Plastic Traffic Letter $ .0 �' $ I, 9 C� • <br /> I _ Each Per Each <br /> 17 <br /> • <br /> II <br /> 2020 PAVEMENT MAINTENANCE OVERLAY SCHEDULE A • DIVISION P <br /> WORK ORDER 3727 4,4e44• -'/ MARCH 16,2020 <br /> IProvided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.