My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quantities Per Street I <br /> Item Number Description BROADWAY Units B D WAY I <br /> 4 HMA Class 1/2 Inch, PG 64-22 Ton 2,960 <br /> 5 Adjust Manhole to Grade Each 13 <br /> 6 Adjust Catch Basin/Inlet to Grade Each 14 <br /> 7 Adjust Valve Box to Grade Each 2 <br /> 8 Adjust Existing Monument Castings to Grade Each 2 <br /> 9 Planing Bituminous Pavement(2" Deep) S.Y. ` 22,057 <br /> 10 Additional Planing Bituminous Pavement S.Y. 6,617 <br /> 11 Vehicle Loop Detectors L.F. 1,900 <br /> 12 Loop Lead-In Detector Cable L.F. 250 I <br /> 13 Conduit Pipe,2" Diameter L.F. 20 <br /> 14 Temporary Pavement Markings L.F. 11,000 <br /> 15 Plastic Wide Line L.F. - 1 <br /> 16 Plastic Traffic Arrow Each 2 <br /> 17 24" Plastic Crosswalk Line L.F. 580 <br /> 18 24" Plastic Stop Bar L.F. 163 <br /> 19 Paint Line L.F. - <br /> 20 Plastic Line L.F. 14,160 <br /> 21 Plastic Traffic Letter Each 7 <br /> 22 Plastic Bicycle Lane Symbol Each - <br /> 23 Raised Pavement Markers,Type 2 Hund 1.15 III <br /> 24 Removing Sidewalk S.Y. 7 <br /> 25 Replace Junction Box Each - <br /> 26 Uniformed Police Officer Hour 80 I <br /> 27 Street Cleaning Hour 46 <br /> 28 Portable Changeable Message Sign Hour - <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 2020 Pavement Maintenance Overlay APPENDIX G February 20,2020 I <br /> WORK ORDER#3727 PAGE 2 of 13 <br /> ..o614w f'/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.