My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Quantities Per Street <br /> IItem Number Description Units HEWITT AVE <br /> 4 HMA Class 1/2 Inch, PG 64-22 Ton 749 <br /> 5 Adjust Manhole to Grade Each 5 <br /> 6 Adjust Catch Basin/Inlet to Grade Each 4 <br /> 7 Adjust Valve Box to Grade Each 3 <br /> 8 Adjust Existing Monument Castings to Grade Each 2 <br /> 9 Planing Bituminous Pavement (2" Deep) S.Y. 5,582 <br /> I10 Additional Planing Bituminous Pavement S.Y. 1,675 <br /> 11 Vehicle Loop Detectors L.F. 1,620 <br /> I 12 Loop Lead-In Detector Cable L.F. 390 <br /> 13 Conduit Pipe, 2" Diameter L.F. 40 <br /> 14 Temporary Pavement Markings L.F. 6,690 <br /> I 15 Plastic Wide Line L.F. - <br /> 16 Plastic Traffic Arrow Each 4 <br /> 17 24" Plastic Crosswalk Line L.F. 410 <br /> 18 24" Plastic Stop Bar L.F. 75 <br /> 19 Paint Line L.F. 535 <br /> I 20 Plastic Line L.F. 2,940 <br /> 21 Plastic Traffic Letter Each - <br /> 22 Plastic Bicycle Lane Symbol Each - <br /> I 23 Raised Pavement Markers,Type 2 Hund 0.74 <br /> 24 Removing Sidewalk S.Y. 15 <br /> 25 Replace Junction Box Each 2 <br /> I26 Uniformed Police Officer Hour 50 <br /> 27 Street Cleaning Hour 12 <br /> I28 Portable Changeable Message Sign Hour 564 <br /> I <br /> I <br /> 1 <br /> I <br /> I 2020 Pavement Maintenance Overlay APPENDIX G February 20,2020 <br /> WORK ORDER#3727 PAGE 3 of 13 <br /> ,A.4P,e....4.4.4. ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.