My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTRUCTIONS TO BIDDERS <br /> I <br /> 1.0 Design Engineer <br /> Questions and inquiries about these Contract Provisions should be directed to the attention <br /> of Gael Fisk, P.E., (425) 257 — 8909 or gfisk@everettwa.gov. <br /> 2.0 Bidder's Check List <br /> The bidder's attention is directed to the following City-provided forms which must be <br /> executed in full as required and submitted with the bid: <br /> 1. Proposal: The lump sum and unit price items must be shown in the space provided. <br /> Show unit prices in figures. <br /> 2. Proposal Signature Sheet: To be filled in and signed by the Bidder. <br /> 3. Subcontractor List: To be filled in by the Bidder. <br /> 4. Disadvantaged/Women's Business Enterprise Contact Form: To be filled in and <br /> signed by the bidder. <br /> 5. Non-Collusion Declaration: To be submitted with the bid. <br /> 6. Bid Bond: This form is to be executed by the Bidder and the surety company unless <br /> bid is accompanied by a certified check. The amount of this bond shall be not less <br /> than five percent (5%) of the total amount bid and may be shown in dollars or on a <br /> percentage basis. Cash will not be accepted. <br /> Failure to complete the aforementioned forms and to submit said forms with the bid may be <br /> due cause for rejection of bid. <br /> 3.0 Pre-Award Forms <br /> The following form is required to be signed and submitted prior to award of Contract: <br /> 1. Certification of Compliance with Wage Payment Statutes: To be filled in and <br /> signed. This certification is not required to be submitted with the bid proposal and <br /> may be submitted after bid opening. The Contract cannot be awarded without this <br /> certification. <br /> 4.0 Contract Forms <br /> The following forms are to be executed after the award of Contract: <br /> 1. Contract: This Contract to be executed by the successful bidder in duplicate within <br /> ' twenty (20) calendar days after the award date. <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 1 OF 2 DIVISION B <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.