My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-05.14 Cooperation With Other Contractors 14 <br /> 2 1-05.15 Method of Serving Notices 15 I <br /> 3 1-05.16 Water and Power 15 <br /> 4 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 15 I <br /> 5 1-07.1 Laws to be Observed 15 <br /> 6 1-07.2 State Sales Tax 16 I <br /> 7 1-07.2(1) State Sales Tax- Rule 171 16 <br /> 8 1-07.2(2) State Sales Tax- Rule 170 17 I <br /> 9 1-07.2(3) Services 17 <br /> 10 1-07.7 Load Limits 17 <br /> 11 1-07.13 Contractor's Responsibility for Work 17 <br /> 12 1-07.13(4) Repair of Damage 17 I <br /> 13 1-07.17 Utilities and Similar Facilities 18 <br /> 14 1-07.18 Insurance 20 I <br /> 15 1-07.18(1) General Requirements 20 <br /> 16 1-07.18(2)Additional Insured 21 <br /> 17 1-07.18(3) Subcontractors 21 I <br /> 18 1-07.18(4) Verification of Coverage 21 <br /> 19 1-07.18(5) Coverages and Limits 22 <br /> 20 1-07.18(5)A Commercial General Liability 22 <br /> 21 1-07.18(5)BAutomobile Liability 23 <br /> 22 1-07.18(5)C Workers' Compensation 23 <br /> 23 1-07.18(5)D Excess or Umbrella Liability 23 <br /> 24 1-07.18(5)E LHWCA Insurance 23 <br /> 25 1-07.18(5)J Pollution Liability 23 I <br /> 26 1-07.18(5)K Professional Liability 24 <br /> 27 1-07.23 Public Convenience and Safety 24 <br /> 28 1-07.23(1) Construction Under Traffic 24 1 <br /> 29 1-07.24 Rights of Way 27 <br /> 30 1-08 PROSECUTION AND PROGRESS 28 1 <br /> 31 1-08.0 Preliminary Matters 28 <br /> 32 1-08.0(1) Preconstruction Conference 28 <br /> 33 1-08.0(2) Hours of Work 28 <br /> 34 1-08.1 Subcontracting 29 <br /> 35 1-08.3 Progress Schedule 30 <br /> 36 1-08.3(2) Progress Schedule Types 30 <br /> 37 1-08.3(2)A Type A Progress Schedule 30 <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE B OF 7 SPECIAL PROVISIONS I <br /> WORK ORDER 3727 FEBRUARY 17,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.