My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 CONTENTS <br /> I2 <br /> 3 INTRODUCTION TO THE SPECIAL PROVISIONS 1 <br /> I 4 <br /> 5 DIVISION 1 <br /> 6 GENERAL REQUIREMENTS <br /> I7 DESCRIPTION OF WORK 2 <br /> I 8 1-01 DEFINITION AND TERMS 2 <br /> 9 1-01.3 Definitions 2 <br /> 10 1-02 BID PROCEDURES AND CONDITIONS 4 <br /> I11 1-02.1 Qualification of Bidder 4 <br /> 12 1-02.2 Plans and Specifications 4 <br /> I13 1-02.5 Proposal Forms 5 <br /> 14 1-02.6 Preparation of Proposal 5 <br /> I15 1-02.6(1) Recycled Materials Proposal 6 <br /> 16 1-02.7 Bid Deposit 6 <br /> 1 17 1-02.9 Delivery of Proposal 6 <br /> 18 1-02.10 Withdrawing, Revising, or Supplementing Proposal 7 <br /> I19 1-02.13 Irregular Proposals 8 <br /> 20 1-02.14 Disqualification of Bidders 9 <br /> I 21 1-02.15 Pre Award Information 9 <br /> 22 1-03 AWARD AND EXECUTION OF CONTRACT 9 <br /> 23 1-03.1 Consideration of Bids 9 <br /> I24 1-03.1(1) Identical Bid Totals 10 <br /> 25 1-03.3 Execution of Contract 10 <br /> I26 1-03.4 Contract Bond 10 <br /> 27 1-03.7 Judicial Review 11 <br /> I28 1-04 SCOPE OF WORK 11 <br /> 29 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> I 30 Specifications, and Addenda 12 <br /> 31 1-05 CONTROL OF WORK 12 <br /> 32 1-05.7 Removal of Defective and Unauthorized Work 12 <br /> I33 1-05.11 Final Inspections and Operational Testing 13 <br /> 34 1-05.11(1) Substantial Completion Date 13 <br /> I35 1-05.11(2) Final Inspection And Physical Completion Date 13 <br /> 36 1-05.11(3) Operational Testing 14 <br /> 1 37 1-05.13 Superintendents, Labor and Equipment of Contractor 14 <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY PAGE A OF 7 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 17,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.