Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 1-02.13.RTF I <br /> 2 1-02.13 Irregular Proposals <br /> 3 (December 19, 2019 APWA GSP) <br /> 4 <br /> 5 Delete this section and replace it with the following: I <br /> 6 <br /> 7 1. A Proposal will be considered irregular and will be rejected if: <br /> 8 a. The Bidder is not prequalified when so required; I <br /> 9 b. The authorized Proposal form furnished by the Contracting Agency is not used or <br /> 10 is altered; <br /> 11 c. The completed Proposal form contains any unauthorized additions, deletions, 111 <br /> 12 alternate Bids, or conditions; <br /> 13 d. The Bidder adds provisions reserving the right to reject or accept the award, or <br /> 14 enter into the Contract; I <br /> 15 e. A price per unit cannot be determined from the Bid Proposal; <br /> 16 f. The Proposal form is not properly executed; <br /> 17 g. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, <br /> 18 as required in Section 1-02.6; <br /> 19 h. The Bidder fails to submit or properly complete an Underutilized Disadvantaged <br /> 20 Business Enterprise Certification, if applicable, as required in Section 1-02.6; <br /> 21 i. The Bidder fails to submit written confirmation from each UDBE firm listed on the <br /> 22 Bidder's completed UDBE Utilization Certification that they are in agreement with <br /> 23 the bidder's UDBE participation commitment, if applicable, as required in Section <br /> 24 1-02.6, or if the written confirmation that is submitted fails to meet the I <br /> 25 requirements of the Special Provisions; <br /> 26 j The Bidder fails to submit UDBE Good Faith Effort documentation, if applicable, <br /> 27 as required in Section 1-02.6, or if the documentation that is submitted fails to ' <br /> 28 demonstrate that a Good Faith Effort to meet the Condition of Award was made; <br /> 29 k. The Bidder fails to submit a UDBE Bid Item Breakdown form, if applicable, as <br /> 30 required in Section 1-02.6, or if the documentation that is submitted fails to meet I <br /> 31 the requirements of the Special Provisions; <br /> 32 I. The Bidder fails to submit UDBE Trucking Credit Forms, if applicable, as required <br /> 33 in Section 1-02.6, or if the documentation that is submitted fails to meet the <br /> 34 requirements of the Special Provisions; <br /> 35 m. The Bid Proposal does not constitute a definite and unqualified offer to meet the <br /> 36 material terms of the Bid invitation; or <br /> 37 n. More than one Proposal is submitted for the same project from a Bidder under I <br /> 38 the same or different names. <br /> 39 <br /> 40 2. A Proposal may be considered irregular and may be rejected if: <br /> 41 a. The Proposal does not include a unit price for every Bid item; <br /> 42 b. Any of the unit prices are excessively unbalanced (either above or below the <br /> 43 amount of a reasonable Bid) to the potential detriment of the Contracting Agency; <br /> 44 c. Receipt of Addenda is not acknowledged; <br /> 45 d. A member of a joint venture or partnership and the joint venture or partnership <br /> 46 submit Proposals for the same project (in such an instance, both Bids may be I <br /> 47 rejected); or <br /> 48 e. If Proposal form entries are not made in ink. <br /> 49 I <br /> I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 8 OF 79 SPECIAL PROVISIONS I <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.