My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• UDBE Bid Item Breakdown (WSDOT 272-054) <br /> II <br /> 2 • UDBE Trucking Credit Form (WSDOT 272-058) <br /> 3 <br /> 4 These documents, if applicable, shall be received either with the Bid Proposal or as a <br /> 111 <br /> 5 supplement to the Bid. These documents shall be received no later than 48 hours (not <br /> 6 including Saturdays, Sundays and Holidays) after the time for delivery of the Bid Proposal. <br /> 7 <br /> I <br /> 8 If submitted after the Bid Proposal is due, the document(s) must be submitted in a sealed <br /> 9 envelope labeled the same as for the Proposal, with "Supplemental Information" added. All <br /> 10 other information required to be submitted with the Bid Proposal must be submitted with the <br /> 11 Bid Proposal itself, at the time stated in the Call for Bids. <br /> 12 <br /> 13 Proposals that are received as required will be publicly opened and read as specified in <br /> I <br /> 14 15 Section 1-02.12. The Contracting Agency will not open or consider any Bid Proposal that is <br /> received after the time specified in the Call for Bids for receipt of Bid Proposals, or received <br /> 16 in a location other than that specified in the Call for Bids. The Contracting Agency will not <br /> I17 18 open or consider any "Supplemental Information" (UDBE confirmations, or GFE <br /> documentation) that is received after the time specified above, or received in a location <br /> 19 other than that specified in the Call for Bids. <br /> 20 <br /> 21 If an emergency or unanticipated event interrupts normal work processes of the Contracting <br /> 22 Agency so that Proposals cannot be received at the office designated for receipt of bids as <br /> 23 specified in Section 1-02.12 the time specified for receipt of the Proposal will be deemed to <br /> I 24 be extended to the same time of day specified in the solicitation on the first work day on <br /> 25 which the normal work processes of the Contracting Agency resume. <br /> 26 <br /> I 27 1-02.10.RTF <br /> 28 1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> 29 (July 23, 2015 APWA GSP) <br /> I 30 <br /> 31 Delete this section, and replace it with the following: <br /> 32 <br /> I 33 After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may withdraw, <br /> 34 revise, or supplement it if: <br /> 35 <br /> 36 1. The Bidder submits a written request signed by an authorized person and physically <br /> I 37 delivers it to the place designated for receipt of Bid Proposals, and <br /> 38 2. The Contracting Agency receives the request before the time set for receipt of Bid <br /> 39 Proposals, and <br /> I <br /> 40 3. The revised or supplemented Bid Proposal (if any) is received by the Contracting <br /> 41 Agency before the time set for receipt of Bid Proposals. <br /> 42 <br /> I 43 If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received before <br /> 44 the time set for receipt of Bid Proposals, the Contracting Agency will return the unopened <br /> 45 Proposal package to the Bidder. The Bidder must then submit the revised or supplemented <br /> I 46 package in its entirety. If the Bidder does not submit a revised or supplemented package, <br /> 47 then its bid shall be considered withdrawn. <br /> 48 <br /> I <br /> 49 50 Late revised or supplemented Bid Proposals or late withdrawal requests will be date recorded <br /> by the Contracting Agency and returned unopened. Mailed, emailed, or faxed requests to <br /> 51 withdraw, revise, or supplement a Bid Proposal are not acceptable. <br /> I <br /> 52 <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 7 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.