Laserfiche WebLink
I <br /> I 2 • The Sewer "0" project on Colby Ave between 37th St and 40th St will likely start <br /> 3 construction mid-June. Due to the detours for Rucker Ave and this project coordination <br /> 4 will need to be considered, more information will be given at the pre-construction <br /> I 5 meeting. Rucker shall be the first street in the order of work. <br /> 6 <br /> 7 • Coordination with the City of Everett Utility and Road Crews that will be upgrading <br /> I 8 drainage and grading the final road and dike surfaces to be paved on Smith Island will <br /> 9 be necessary. More information will be given at the pre-construction meeting. Paving <br /> 10 shall not begin before August 1, 2020 on Smith Island or until City Crews are <br /> Ii finished, whichever is sooner. <br /> 12 <br /> 13 *** <br /> I 14 <br /> 15 1-05.15.RTF <br /> 16 1-05.15 Method of Serving Notices <br /> I17 (March 25, 2009 APWA GSP) <br /> 18 Revise the second paragraph to read: <br /> 19 <br /> 1, 20 All correspondence from the Contractor shall be directed to the Project Engineer. All <br /> 21 correspondence from the Contractor constituting any notification, notice of protest, notice of <br /> 22 dispute, or other correspondence constituting notification required to be furnished under the <br /> I 23 Contract, must be in paper format, hand delivered or sent via mail delivery service to the <br /> 24 Project Engineer's office. Electronic copies such as e-mails or electronically delivered <br /> 25 copies of correspondence will not constitute such notice and will not comply with the <br /> I <br /> 26 requirements of the Contract. <br /> 27 <br /> 28 1-05.16.RTF <br /> I 29 Add the following new section: <br /> 30 <br /> 31 1-05.16 Water and Power <br /> 32 (October 1, 2005 APWA GSP) <br /> I33 <br /> 34 The Contractor shall make necessary arrangements, and shall bear the costs for power and <br /> 35 water necessary for the performance of the work, unless the contract includes power and <br /> 36 water as a pay item. <br /> 37 <br /> 38 1-07.GR1 <br /> I 39 Legal Relations and Responsibilities to the Public <br /> 40 <br /> 41 1-07.1.RTF <br /> I 42 1-07.1 Laws to be Observed <br /> 43 (October 1, 2005 APWA GSP) <br /> 44 <br /> I 45 Supplement this section with the following: <br /> 46 <br /> 47 In cases of conflict between different safety regulations, the more stringent regulation shall <br /> I <br /> 48 49 apply. <br /> 50 The Washington State Department of Labor and Industries shall be the sole and paramount <br /> 51 administrative agency responsible for the administration of the provisions of the Washington <br /> I52 Industrial Safety and Health Act of 1973 (WISHA). <br /> 53 <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3727 PAGE 15 OF 79 SPECIAL PROVISIONS <br /> FEBRUARY 20,2020 <br />