My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 During actual hours of work, unless protected as described above, only materials <br /> 111 2 absolutely necessary to construction shall be within the WZCZ and only <br /> 3 construction vehicles absolutely necessary to construction shall be allowed within <br /> 4 the WZCZ or allowed to stop or park on the shoulder of the roadway. <br /> 5 <br /> 6 The Contractor's nonessential vehicles and employees private vehicles shall not be <br /> 7 permitted to park within the WZCZ at any time unless protected as described above. <br /> I 8 <br /> 9 Deviation from the above requirements shall not occur unless the Contractor has <br /> 10 requested the deviation in writing and the Engineer has provided written approval. <br /> I 11 <br /> 12 Minimum WZCZ distances are measured from the edge of traveled way and will be <br /> 13 determined as follows: <br /> I 14 <br /> Regulatory Distance From <br /> Posted Speed Traveled Way <br /> I <br /> 35 mph or less (Feet)10 <br /> 40 mph 15 <br /> 45 to 50 mph 20 <br /> I55 to 60 mph 30 <br /> 65 mph or greater 35 <br /> 15 <br /> 16 Minimum Work Zone Clear Zone Distance <br /> 17 <br /> 18 <br /> I <br /> 19 (January 5, 2015) <br /> 20 <br /> 21 Lane closures are subject to the following restrictions: <br /> I 22 <br /> 23 *** <br /> 24 Schedule A <br /> I 25 <br /> 26 116th St SE-19'Ave SE East to City Limits <br /> 27 Detour route will not be permitted 2:30pm to 6:00pm and 10:00pm to 6:00am, except for <br /> I <br /> 28 29 pavement marking work. No lane closures or single lane alternating flagging operation will <br /> be permitted between 2:00pm and 6:00pm. Lane closures for plastic pavement marking <br /> 30 work shall not occur between the hours of 5:00am to 6:00pm. Lane closures for casting <br /> I 31 adjustments will not be permitted 2:00pm to 6:00pm and 9:00pm to 7:00am. <br /> 32 <br /> 33 21st St-Hoyt Ave to Colby Ave <br /> I 34 No lane closures or single lane alternating flagging operation will be permitted between <br /> 35 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 36 <br /> 37 Broadway Alleys-2300 Block to 2700 Block <br /> I 38 No alley closures or flagging operation will be permitted between 10:00pm and 7:00am. <br /> 39 Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 40 <br /> I 41 Broadway-Madison St to 52"d St <br /> 42 Detour route will not be permitted 2:30pm to 6:00pm and 10:00pm to 6:00am, except for <br /> 43 pavement marking work. No lane closures or single lane alternating flagging operation will <br /> 44 be permitted between 2:00pm and 6:00pm. Lane closures for plastic pavement marking <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3727 PAGE 25 OF 79 SPECIAL PROVISIONS <br /> FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.