My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2 1. A holiday, <br /> 3 <br /> 4 2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or Monday <br /> I <br /> 5 are considered a holiday weekend. A holiday weekend includes Saturday, <br /> 6 Sunday, and the holiday. <br /> 7 <br /> I <br /> 8 3. After*** 2:30 P.M. *** on the day prior to a holiday or holiday weekend, and <br /> 9 <br /> 10 4. Before *** 7:00 A.M. *** on the day after the holiday or holiday weekend. <br /> I 11 <br /> 12 1-07.24.RTF <br /> 13 1-07.24 Rights of Way <br /> I 14 (July 23, 2015 APWA GSP) <br /> 15 <br /> 16 Delete this section and replace it with the following: <br /> I 17 <br /> 18 Street Right of Way lines, limits of easements, and limits of construction permits are <br /> 19 indicated in the Plans. The Contractor's construction activities shall be confined within these <br /> 20 limits, unless arrangements for use of private property are made. <br /> I <br /> 21 <br /> 22 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of way <br /> 23 and easements, both permanent and temporary, necessary for carrying out the work. <br /> I 24 Exceptions to this are noted in the Bid Documents or will be brought to the Contractor's <br /> 25 attention by a duly issued Addendum. <br /> 26 <br /> I 27 Whenever any of the work is accomplished on or through property other than public Right of <br /> 28 Way, the Contractor shall meet and fulfill all covenants and stipulations of any easement <br /> 29 agreement obtained by the Contracting Agency from the owner of the private property. <br /> ' 30 31 Copies of the easement agreements may be included in the Contract Provisions or made <br /> available to the Contractor as soon as practical after they have been obtained by the <br /> 32 Engineer. <br /> I 33 <br /> 34 Whenever easements or rights of entry have not been acquired prior to advertising, these <br /> 35 areas are so noted in the Plans. The Contractor shall not proceed with any portion of the <br /> 36 work in areas where right of way, easements or rights of entry have not been acquired until <br /> I 37 the Engineer certifies to the Contractor that the right of way or easement is available or that <br /> 38 the right of entry has been received. If the Contractor is delayed due to acts of omission on <br /> 39 the part of the Contracting Agency in obtaining easements, rights of entry or right of way, the <br /> I <br /> 40 Contractor will be entitled to an extension of time. The Contractor agrees that such delay <br /> 41 shall not be a breach of contract. <br /> 42 <br /> I 43 Each property owner shall be given 48 hours notice prior to entry by the Contractor. This <br /> 44 includes entry onto easements and private property where private improvements must be <br /> 45 adjusted. <br /> I 46 <br /> 47 The Contractor shall be responsible for providing, without expense or liability to the <br /> 48 Contracting Agency, any additional land and access thereto that the Contractor may desire <br /> I <br /> 49 50 for temporary construction facilities, storage of materials, or other Contractor needs. <br /> However, before using any private property, whether adjoining the work or not, the <br /> 51 Contractor shall file with the Engineer a written permission of the private property owner, <br /> 52 and, upon vacating the premises, a written release from the property owner of each property <br /> 53 disturbed or otherwise interfered with by reasons of construction pursued under this <br /> 54 contract. The statement shall be signed by the private property owner, or proper authority <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 27 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.