My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1. City of Everett Police Officers Association <br /> 2 Post Office Box 1253 I <br /> 3 Everett, WA 98201 <br /> 4 Contacts: <br /> 5 Officer Mike Bernardi (425) 327-9119 I <br /> 6 Officer Mike Drake (425) 244-0025 <br /> 7 <br /> 8 2. Puget Sound Executive Services <br /> 9 625 B 5th Avenue, Suite 4 <br /> 10 Sequim, WA 98382 <br /> 11 Contact: <br /> 12 Nick Janssen (360) 681-7737 111 <br /> 13 <br /> 14 At the time of returning signals to normal operation, a city of Everett traffic signal <br /> 15 technician shall be present and on standby since most signals will not return to normal <br /> 16 operation with a turn of the police panel switch and require a conflict monitor reset. <br /> 17 <br /> 18 Coordination of traffic signal technician shall be coordinated with the following <br /> 19 personnel: <br /> 20 <br /> 21 1. City of Everett Public Works <br /> 22 3200 Cedar Street <br /> 23 Everett, WA 98201 <br /> 24 Contact: ' <br /> 25 Steve Sawyer (425) 328-0643 <br /> 26 <br /> 27 1-10.4.GR1 <br /> 28 Measurement <br /> 29 <br /> 30 1-10.4(3).GR1 I <br /> 31 Reinstating Unit Items With Lump Sum Traffic Control <br /> 32 <br /> 33 1-10.4(3),I NST1.G R1 <br /> 34 Section 1-10.4(3) is supplemented with the following: <br /> 35 <br /> 36 F1-10.4(3).OPTI.DOCX <br /> 37 (August 2, 2004) I <br /> 38 <br /> 39 The bid proposal contains the item "Project Temporary Traffic Control," lump sum and <br /> 40 the additional temporary traffic control items listed below. The provisions of Section 1- <br /> 41 10.4(1), Section 1-10.4(3), and Section 1-10.5(3) shall apply. <br /> 42 <br /> 43 *** "Portable Changeable Message Sign," per Hour. I <br /> 44 "Flaggers", per Hour. <br /> 45 "Uniformed Police Officer", per Hour.*** <br /> 47 <br /> 47 1-10.5.GR1 <br /> 48 Payment <br /> 49 I <br /> 50 1-10.5(2).GR1 <br /> 51 Item Bids with Lump Sum for Incidentals <br /> 52 <br /> I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 36 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.