My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-10.2.GR1 <br /> 1 2 Traffic Control Management <br /> 3 <br /> 4 1-10.2(1).GR1 <br /> I <br /> 5 General <br /> 6 <br /> 7 1-10.2(1),INST1.GR1 <br /> I 8 Section 1-10.2(1) is supplemented with the following: <br /> 9 <br /> 10 1-10.2(1).OPT1.GR1 <br /> 11 (January 3, 2017) <br /> 12 Only training with WSDOT TCS card and WSDOT training curriculum is recognized in <br /> 13 the State of Washington. The Traffic Control Supervisor shall be certified by one of the <br /> I 14 following: <br /> 15 <br /> 16 The Northwest Laborers-Employers Training Trust <br /> I 17 27055 Ohio Ave. <br /> 18 Kingston, WA 98346 <br /> 19 (360) 297-3035 <br /> 20 <br /> 21 Evergreen Safety Council <br /> 22 12545 135th Ave. NE <br /> 23 Kirkland, WA 98034-8709 <br /> I 24 1-800-521-0778 <br /> 25 <br /> 26 The American Traffic Safety Services Association <br /> I 27 15 Riverside Parkway, Suite 100 <br /> 28 Fredericksburg, Virginia 22406-1022 <br /> 29 Training Dept. Toll Free (877) 642-4637 <br /> I 30 Phone: (540) 368-1701 <br /> 31 <br /> 32 1-10.3.GR1 <br /> I <br /> 33 Traffic Control Labor, Procedures and Devices <br /> 34 <br /> 35 1-10.3(1).GR1 <br /> I <br /> 36 Traffic Control Labor <br /> 37 <br /> 38 COE 1-10.3(1)C.DOCX <br /> 39 (City of Everett) <br /> I40 Section 1-10.3(1) is added as follows: <br /> 41 <br /> 42 1-10.3(1)C Uniformed Police Officer <br /> I 43 (******) <br /> 44 <br /> 45 The Contractor shall provide commissioned uniformed police control at any time a <br /> I 46 signalized intersection is dark or inoperative, such as during grinding or paving <br /> 47 operations where the traffic signal must be put into flashing operation. Signalized <br /> 48 intersections shall not be police controlled between the hours of 6:00am and 8:30am nor <br /> I 49 12:00pm to 7:30pm, unless directed by the Engineer. <br /> 50 <br /> 51 Coordination of commissioned uniformed Police control shall be coordinated with the <br /> I 52 following personnel, listed in order of preference: <br /> 53 <br /> ' 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 35 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.