My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 2-02.5.GR2 <br /> 2 Payment 1 <br /> 3 <br /> 4 2-02.5.INST2.GR2 <br /> 5 Section 2-02.5 is supplemented with the following: I <br /> 6 <br /> 7 CNH 2-02.5.OPT16.DOCX <br /> 8 (******) I <br /> 9 "Removing Sidewalk", per square yard. <br /> 10 I <br /> 11 "Sawcut Asphalt Concrete Pavement", per lineal foot. <br /> 12 <br /> 13 GLF 2-08.DOCX <br /> 14 2-08 STREET CLEANING <br /> 15 (******) <br /> 16 <br /> 17 Section 2-08 of the standard specifications is vacant shall be replaced by the following: <br /> 18 I <br /> 19 2-08.1 Description <br /> 20 <br /> 21 This work shall consist of sweeping all construction related roads, and cleaning the pavement <br /> 22 and removing debris from the roadway. <br /> 23 <br /> 24 2-08.2 Vacant I <br /> 25 <br /> 26 2-08.3 Construction Requirements <br /> 27 I <br /> 28 The use of water to perform street sweeping work shall be held to a minimum unless <br /> 29 designated otherwise by the Engineer. The contractor shall provide self-propelled pickup <br /> 30 sweepers and/or vacuum pick up sweepers for pavement cleaning and debris removal I <br /> 31 whenever their use is ordered by the Engineer. The type and number of sweepers are subject <br /> 32 to the approval of the Engineer. <br /> 33 <br /> 34 Daily sweeping shall continue on all construction related roads at least once per day until 1 <br /> 35 said surface is covered with new HMA. In the event the Contractor sweeper will not be able <br /> 36 to work daily on ground surfaces, the City Forces will provide services, and the Contractor <br /> 37 will be billed for each hour of operation. I <br /> 38 <br /> 39 The following work shall not be paid by "Street Cleaning", it shall be included in the bid item <br /> 40 "Planing Bituminous Pavement" (2" Deep), per square yard: I <br /> 41 <br /> 42 1. Sweepers following the grinding work. <br /> 43 2. Debris left in the road or on the side of the road from Planing Bituminous Pavement. <br /> 44 <br /> 45 The Contractor shall plan the operation to minimize the need for street cleaning. <br /> 46 <br /> 47 2-08.4 Measurement <br /> 48 <br /> 49 Street cleaning will be measured by the hour for the actual time consumed in sweeping, <br /> 50 pavement cleaning, and debris removal. No allowance will be made for time consumed in I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 40 OF 79 SPECIAL PROVISIONS I <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.