My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 GLF 2-02.3(4B.DOCX <br /> 2 2-02.3(3)B Temporary Asphalt Concrete Sidewalk <br /> 3 ( ) <br /> 4 <br /> I <br /> 5 Temporary asphalt concrete sidewalk shall be placed by the end of each shift after <br /> 6 finishing connections to the junction boxes. <br /> 7 <br /> I <br /> 8 9 Temporary asphalt concrete sidewalk shall be constructed of Commercial HMA as <br /> specified in Section 5-04. The HMA will have a dense, uniform surface and will fully <br /> 10 retain its shape, grade, and shall be free of tripping hazards after placement. <br /> 11 <br /> 12 Temporary asphalt concrete sidewalk shall be included in the bid item "Removing <br /> 13 Sidewalk". <br /> I 14 <br /> 15 GLF 2-02.3(3)C.DOCX <br /> 16 2-02.3(3)C Sawcut Asphalt Concrete Pavement <br /> 17 ( ) <br /> 118 <br /> 19 Remove full depth existing permanent type pavement and driveway pavement <br /> 20 shown on the Plans or as directed by the Engineer. <br /> I <br /> 21 Replace, at no expense to the City, existing pavement designated to remain that is <br /> 22 damaged during the pavement base removal. <br /> 23 <br /> I 24 Make vertical full depth saw cut between existing asphalt concrete pavement, to <br /> 25 remain and the portion to be removed. <br /> 26 <br /> I 27 2-02.4.GR2 <br /> 28 Measurement <br /> 29 <br /> I 30 2-02.4.INSTI.GR2 <br /> 31 Section 2-02.4 is supplemented with the following: <br /> 32 <br /> I 33 CNH 2-02.4.OPT3.DOCX <br /> 34 (******) <br /> I35 "Removing Sidewalk", per square yard <br /> 36 <br /> 37 Measurement for Removing Sidewalk shall be by the square yard. The unit contract price <br /> 38 shall be full pay for all labor, materials, tools, and equipment necessary to satisfactorily <br /> 39 complete the Work as described in this section for removing sidewalk where shown in the <br /> 40 Plans, including sawcutting up to 4" in depth, removal of concrete panels entirely, temporary <br /> 41 asphalt concrete sidewalk as described in this section, restoration of native vegetation <br /> I 42 disturbed by the operation, and all other Work necessary for the removal of sidewalk panels <br /> 43 and disposal of materials and cutting slurry from the site, including vacuum collection. <br /> 44 <br /> I <br /> 45 "Sawcut Asphalt Concrete Pavement", per lineal foot. <br /> 46 <br /> 47 Measurement for Sawcut Asphalt Concrete Pavement shall be by the linear foot. The unity <br /> I 48 contract price shall be full pay for all labor, materials, tools, and equipment necessary to <br /> 49 satisfactorily complete the Work as described in this section for sawcut asphalt concrete <br /> 50 pavement where shown in the plans and disposal of materials from the site. <br /> I <br /> 51 <br /> 52 <br /> 1 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 39 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.