My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> I9. 115,746 Planing Bituminous $ • $ <br /> Square Yard Pavement(2" Deep) Per S.Y. <br /> 1 10. 34,724 Additional Planing $ • $ <br /> Square Yard Bituminous Pavement Per S.Y. <br /> 1 11. 8,250 Vehicle Loop Detectors $ . $ <br /> Linear Foot Per L.F. <br /> I12. 690 Loop Lead-In Detector Cable $ • $ <br /> Linear Foot Per L.F. <br /> I13. 120 Conduit Pipe,2" Diameter $ • $ <br /> ILinear Foot Per L.F. <br /> 14. 109,130 Temporary Pavement $ • $ <br /> 1 Linear Foot Markings Per L.F. <br /> 15. 920 Plastic Wide Line $ $ <br /> ILinear Foot Per L.F. <br /> 16. 56 Plastic Traffic Arrow $ • $ <br /> IEach Per Each <br /> 17. 2,130 24" Plastic Crosswalk Line $ • $ <br /> ILinear Foot Per L.F. <br /> I 18. 710 24" Plastic Stop Bar $ $ <br /> Linear Foot Per L.F. <br /> I 19. 3,045 Paint Line $ $ <br /> Linear Foot Per L.F. <br /> 1 20. 70,495 Plastic Line $ $ <br /> Linear Foot Per L.F. <br /> ' 21. 15 Plastic Traffic Letter $ • $ <br /> Each Per Each <br /> I <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY ^SCHEDULE A DIVISION P <br /> WORK ORDER 3727 I5►A�K•ly � MARCH 16, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.