Laserfiche WebLink
I <br /> 1 <br /> 2 (******) 1 <br /> 3 Payment will be made for each of the following bid items that are included in the proposal: <br /> 4 <br /> 5 "Adjust Manhole to Grade", per each. <br /> 6 <br /> 7 "Adjust Catch Basin/Inlet to Grade", per each. <br /> 8 <br /> 9 "Adjust Valve Box to Grade", per each. <br /> 10 <br /> 11 The payment for"Adjust Manhole to Grade", "Adjust Catch Basin/Inlet to Grade", shall be full <br /> 12 compensation for all costs necessary to make the adjustment including temporary cover to <br /> 13 adjust the existing structure to required elevation, construction of the asphalt transition <br /> 14 around the structure, and restoration of the adjacent area. Adjustment of any structures twice <br /> 15 will be paid as one adjustment. <br /> 16 <br /> 17 END DIVISION7.RTF <br /> 18 <br /> 19 END DIVISION 7 <br /> 20 1 <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 68 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 /1 ff_at / MARCH 16,2020 <br />