Laserfiche WebLink
Public Works/Engineering Comments — Kirk Brooks (425) 257-8814 <br />A review of this project by the Engineering/Public Services Department indicates that the <br />following conditions should apply: <br />1. A Public Works Permit is required for this project. Detailed drawings in accordance with <br />City Design and Construction Standards shall be submitted to the Public Works Department, <br />showing site parking layout, landscaping, utilities, storm drainage, temporary construction <br />erosion control, and all required improvements in the public right-of-way. Public Works <br />Department approval of these drawings is required prior to any permits being issued. All <br />improvements shall be completed, approved and warranted before the Occupancy Permit is <br />issued/final approval is granted. <br />2. Full standard half street improvements are required to Seaway Blvd & 75th Street SW, <br />including but not limited to curb, gutter, sidewalks, street widening and drainage control <br />per City Design Standards. <br />3. Right-of-way as applicable is to be dedicated to the City for street/alley purposes on the <br />proposal's frontage. <br />4. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br />5. Special charges for connection to the sewer and water systems in accordance with <br />Ordinance 1998-94 and subsequent revision are applicable. These charges are based on <br />projected water usage and can be substantial. Applicant is encouraged to obtain a copy of <br />the Ordinance and determine estimated charges prior to building permit application. The <br />actual charges shall be computed by the Public Works Department per the ordinance in <br />effect at the time and according to the information on the approved plans at the time of <br />building permit issuance. <br />6. Approval of construction plans will require demonstration that all pertinent standards and <br />regulations are met. <br />7. City streets and alleys are to be kept clear of dirt and debris at all times during construction. <br />Dust suppression and street cleaning must occur as directed by the Public Works Inspector. <br />8. As-builts of storm sewer, sanitary sewer, and water systems will be required to be <br />submitted per City Design and Construction Standards and Specifications for Development. <br />9. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br />Inspector. <br />Planned Act A16-034 <br />�8of10 <br />