Laserfiche WebLink
10. The construction plans must be designed from,a site survey performed by a licensed State <br />of Washington land.surveyor. <br />11. All exposed ground must be reseeded within 30 days of the completion of construction. If <br />reseeding is not practical due to weather or seasonal problems, the ground must be <br />covered with mulch as directed by the City Engineer. <br />12. Temporary erosion control measures for construction activity must be operational prior to <br />commencement of any clearing or earthwork. <br />13. Side sewer and water services must meet City of Everett standards. <br />14. Stormwater shall be managed in accordance with the applicable City of Everett stormwater <br />management standards. The City will be adopting new stormwater management standards <br />to become effective on 1/1/2017. At this time, the City's policies regarding vested rights <br />are contained in EMC 15.28 and Planning Director Interpretation #09-02. <br />15. Construction Stormwater Pollution Prevention will be required for this project in <br />compliance with applicable City standards. In addition, if the overall project will disturb <br />more than an acre of land, the applicant must apply for coverage under the Washington <br />State Department of Ecology's Construction Stormwater General Permit. <br />16. Install a traffic signal at the intersection of 75th St SW with the project driveway. <br />17. Completely reconstruct the traffic signal at the intersection of 75th St SW with the PUD <br />driveway just east of the project driveway. <br />18. Provide data infrastructure between the new traffic signal at the project driveway and the <br />City of Everett's Traffic Management Center. <br />19. The site access driveway from Seaway Blvd shall be restricted to right turn ingress and right <br />turn egress only with no left turns. <br />20. Site design and development within City of Everett Right -of -Way shall not preclude future <br />construction of a northbound right turn lane along the project frontage on Seaway Blvd or <br />75th St SW. <br />21. Additional Information for Developer. Lack of comment on the submitted site plan and <br />storm drainage report does not constitute approval of these submittals. The City of Everett <br />does not conduct detailed stormwater reviews of documents until after a project has <br />received a land use approval. However, preliminary review by Erik Emerson of the Public <br />Works Department has yielded the following comments: <br />Planned Actio A16-034 <br />9of10 <br />