My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD 2022-05-13
>
Address Records
>
SEAWAY BLVD
>
7505
>
7505 SEAWAY BLVD 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 4:20:04 PM
Creation date
6/4/2020 10:42:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Runoff from City streets shall be kept separate from the private system unless a hold <br />harmless agreement is provided to the City from Community Transit. The current <br />proposal provides for two separate storm systems, one for private stormwater runoff <br />and one for runoff from the public Rights of Way, which adequately addresses the <br />concerns about mixing public and private stormwater runoff. <br />2. The detention tank proposed for the public system is acceptable in concept with the <br />caveat that steel pipe will not be accepted. <br />3. Oil control measures will be required for the bus traffic areas due to the high frequency <br />of bus traffic. <br />4. The project shall demonstrate compliance with Minimum Requirement #5 for on -site <br />stormwater management. <br />5. The City requires strict compliance with Ecology's General Use Level Designation (GOLD) <br />for Modular Wetland Systems proposed in the City of Everett. The GULD includes the <br />requirement for site plan review and approval by the manufacturer to ensure that site <br />grading and slope are appropriate for use of a MWS-Linear Modular Wetland. <br />6. Reconstruction of the traffic signal is necessary because the proximity of the two <br />driveways requires that a signal traffic signal controller operates both traffic signals. <br />7. This project shall not be required to construct the northbound right turn lane <br />improvement but no elements of the project shall be located within any portion of the <br />Right -of -Way that Public Works deems necessary for the future construction of this <br />improvement. <br />Fire Department Comments — Jim Venturo — (425) 257-8124 <br />No Comments. <br />Snohomish County PUD Comments — Edward Pride — 425.783.4300 <br />The District presently has sufficient electrical system capacity to serve the proposed <br />development. However, the existing District facilities in the local area may require upgrading. <br />Any relocation or removal of District facilities to accommodate this project shall be at the <br />expense of the project developer. Cost of any work, new or upgrade, to existing District <br />facilities shall be at the expense of the project developer and shall be in accordance with the <br />applicable District policy. The developer will be required to supply the District with suitable <br />locations/easements upon its property for any electrical facilities that must be installed to serve <br />the proposed development. We recommend Contact with the District prior to design of the <br />proposed project. For information about specific electrical service requirements, please call the <br />District's Everett office at 425.783.8272 to contact a Customer Engineer. <br />Planned =Of, <br />16-034 <br />
The URL can be used to link to this page
Your browser does not support the video tag.