Laserfiche WebLink
PLANS. SPECIFICATIONS AND ESTIMATE RFVIFW <br />Project Title: <br />75th — Seaway Transit Center 90% Review = <br />Job Charge: <br />Reviewed By: <br />Office & Mail Stop: <br />Phone: <br />Date: <br />Sheet <br />WO# <br />Euneka Richards, Kirk <br />Traffic Operations <br />425-257-8926 <br />2-8-17 <br />6 <br />Brooks, Corey Hert, <br />Erik Emerson <br /># <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Init. <br />supplemented with the following:" <br />44 <br />Special <br />Please replace the full text of this section with the updated attached Everett <br />Requested spec language was added to <br />BAJ <br />Provisions <br />spec: CNH 8-20.2(9-29.2) Junction Box". <br />Section 265616 Part 2.04 as requested. <br />Sec <br />Also updated WSDOT standard Plan and <br />265613 <br />Everett Standard Drawing numbers. <br />Part 2.04 <br />45 <br />Special <br />Everett Special Provisions are in addition to the WSDOT Standard <br />Section 265613 Part2.05, referencing <br />BAJ <br />Provisions <br />Specifications, please either confirm where this is clarified in the specs such <br />CONDUIT, revised by adding the following <br />Sec <br />that we know what WSDOT section this is supplementing or add the text: <br />first paragraph: Conduit shall meet the <br />265613 <br />"WSDOT Section 9-29.1 is supplemented with the following:" preceding the <br />requirements of Standard Specifications <br />Part 2.05 <br />words "Pull String" for section 2.05. <br />Section 9-29.1, and as supplemented with <br />the following:" <br />46 <br />Special <br />Everett Special Provisions are in addition to the WSDOT Standard <br />Section 265613 Part 2.05, referencing <br />BAJ <br />Provisions <br />Specifications, please either confirm where this is clarified in the specs such <br />CONDUIT/Non-Metallic Conduit, revised by <br />Sec <br />that we know what WSDOT section this is supplementing or add the text: <br />adding the following lead-in paragraph: <br />265613 <br />"WSDOT Section 9-29.1(4) is supplemented with the following:" preceding <br />Non-metallic conduit shall meet the <br />Part 2.05 <br />the words "Non -Metallic Conduit" for section 2.05. <br />requirements of Standard Specifications <br />Section 9-29.1(4), and as supplemented <br />with the following:" <br />47 <br />Special <br />Please add the text (with all relevant callouts that these are supplements of <br />Section 321723 Part 2.01, referencing <br />BAJ <br />Provisions <br />WSDOT spec 8-22.3) found in the attached file "Everett Pavement Marking <br />MATERIALS, was revised to cross - <br />Sec <br />Special Provisions 2-9-17" to this section. <br />reference Standard Specifications Section <br />321723 <br />9-34.3(4) for Type D — Liquid Cold Applied <br />methyl Methacrylate rather than Section 9- <br />34.3 for (thermos)plastic. <br />Section 321723 Part 3.01, referencing <br />CONSTRUCTION REQUIREMENTS, was <br />revised by adding new Part A (the <br />requested added text), and renumbering <br />former Part A to new Part B. <br />90% Seaway Review Comments.docxx <br />