Laserfiche WebLink
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br />Project Title: <br />75th — Seaway Transit Center 90% Review <br />Job Charge: <br />Reviewed By: <br />Office & Mail Stop: <br />Phone: <br />Date: <br />Sheet <br />WO# <br />Kirk Brooks <br />Public Works <br />425-257-8814 <br />3-1-17 <br />J5�o�6 <br /># <br />ShVP9 <br />Reviewer's Comment <br />Designer's Response <br />Init. <br />104 <br />All Sheets <br />Change Locate # to 811 <br />Comment incorporated. <br />BJC <br />105 <br />ST1 <br />Add 55' R/W dimensions — see markup <br />Comment incorporated. <br />BJC <br />106 <br />ST1 <br />Update R/W line — see markup <br />Comment incorporated. <br />BJC <br />1071 <br />SC1 <br />Move Street Vacation Line — see markup <br />Comment incorporated. <br />BJC <br />108 <br />SC1 <br />Add 55' RAN dimensions — see markup <br />Comment incorporated. <br />BJC <br />109 <br />SC1 <br />Revise callouts — see markup <br />Comment incorporated. <br />BJC <br />110 <br />ECD1 <br />Revise Construction Sequence #1 — see markup <br />Sequence step 1 has been updated. <br />BJC <br />111 <br />DR2 <br />Is there a detail for the rain garden? Not seeing this detail on DWGDD1 — <br />Detail is on DWG DD6. <br />BJC <br />see markup <br />112 <br />UT2 <br />Why is this a 2" water service for a couple of bathrooms? — see markup <br />Also feeding hose bibs throughout the site. <br />BJC <br />113 <br />UT2 <br />Delete water lines across 75th St SW, replace with water line connecting to <br />Comment incorporated. <br />BJC <br />the south— see markup <br />114 <br />UT2 <br />Revise connection to main location — see markup <br />Location of connection to main has been <br />BJC <br />revised. <br />115 <br />PV1, PV2, <br />Revise General Note #1 to "COE STD 719" — see markup <br />Comment incorporated. <br />BJC <br />PV3, PV4 <br />116 <br />PV1, PV2, <br />Revise Construction Note #17, 18, 19, 26, and 32 to "COE STD 720" - see <br />Comment incorporated. <br />BJC <br />PV3, PV4 <br />markup <br />117 <br />PV1, PV2, <br />Revise Construction Note #28, add "COE STD 319 for ROW Locations" — <br />Construction note 036 to address ROW <br />BJC <br />PV3, PV4 <br />see markup <br />locations. <br />118 <br />PV1, PV2, <br />Revise Construction Note #29, add "COE STD 321 for ROW Locations" — <br />Comment incorporated. <br />BJC <br />PV3, PV4 <br />see markup <br />119 <br />PV1, PV2, <br />All signs installed per COE STD 716. Show existing signs along project <br />Added general note 8. Turned on existing <br />VWW <br />PV3, PV4 <br />frontage on Sign Plan. If relocated or removed show clearly. Show all <br />signs in PV sheets and placed remove sign <br />proposed new signs (inc. signs also shown on SG Series signal plans). <br />symbol on each sign to be removed. Added <br />signage note 4. Placed sign symbols on PV <br />sheets correlating to SG sign locations. <br />90% Seaway Review Comments.docxx <br />/�s/jF <br />