My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD 2022-05-13
>
Address Records
>
SEAWAY BLVD
>
7505
>
7505 SEAWAY BLVD 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 4:20:04 PM
Creation date
6/4/2020 10:42:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br />Project Title: <br />75th — Seaway Transit Center 90% Review <br />Job Charge: <br />Reviewed By: <br />Office & Mail Stop: <br />Phone: <br />Date: <br />Sheet <br />WO# <br />Corey Hart <br />I Public Works <br />425-257-8887 <br />1 2-16-17 <br /># <br />sht]Pg <br />Reviewer's Comment <br />Designer's Response <br />Init. <br />90 <br />SG1 <br />Junction boxes in the traveled lane not allowed, intercept and install Type 2 <br />Revised type and location of junction box <br />MJS <br />junction box. Can be set back, if concerned about loop cable length, can be <br />set back out of the way. — see markup <br />91 <br />SG1 <br />"Bus only" is the standard application per WSDOT STD Plan M-80.10, would <br />We agree and we will call out STD Plan M- <br />MJS <br />wear better and be undertood better than "Transit Only". — see markup <br />80.10. <br />92 <br />SG1 <br />Move Stop Line back — see markup <br />Revised stop line <br />MJS <br />93 <br />SG1 <br />Move L532 and L531 250' back of stop line — see markup <br />Relocated loop layout <br />MJS <br />94 <br />SG1 <br />Show North -Bound Detection as new —see markup <br />Revised linetype <br />MJS <br />95 <br />SG3 <br />Sign Schedule 2, remove "PUD" — see markup <br />Removed <br />MJS <br />96 <br />SG3 <br />Add Sign Schedule 8 — see markup <br />Added sign to poles 4 and 6 <br />MJS <br />97 <br />SG7 <br />Mounting height - Boeing PUD run tall loads through here. 19.0 will work for <br />Revised mast arm mounting heights <br />MJS <br />all except 3 and 5 can be 18.0. — see markup <br />98 <br />TC1 <br />The spec for temporary paint line is one pass, 15 mil. You really need 2 <br />RPM language has been added to the <br />BJC <br />coats for this length of time. Also, Type 2W and 2YY RPMS will be needed <br />construction notes. Spec also updated to <br />on 40' spacing, removal will need to be shot blast or hydroblast, grinding not <br />include 2 coats. <br />allowed. <br />99 <br />TC1 <br />Add W1-4BR —see markup <br />Comment incorporated. <br />BJC <br />100 <br />TC1 <br />Dotted Extension line w/ 2W RPM's every 24' (Every other skip) — see <br />Comment incorporated. <br />BJC <br />markup <br />101 <br />TC2 <br />Same comment about temporary paint and 2W/2YY RPM's TC1 <br />Comment incorporated. <br />BJC <br />102 <br />TC2 <br />After talking with the PUD, they would like to discourage turns, consider <br />Comment noted, however there may be a <br />BJC <br />deleting these arrows <br />need for the public to turn into the PUD <br />entrance. Therefore we are going to keep <br />the arrows. <br />103 <br />TC2 <br />Temporary Channelization Symbol Schedule — Consider removing arrows - <br />See response to Comment #102 above. <br />BJC <br />see markup <br />90% Seaway Review Comments.docxx <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.