My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD 2022-05-13
>
Address Records
>
SEAWAY BLVD
>
7505
>
7505 SEAWAY BLVD 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 4:20:04 PM
Creation date
6/4/2020 10:42:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br />Project Title: <br />Community Transit Swift II BRT — Seaway TC <br />Job Charge: <br />WSDOT Project Engineer: <br />Office & Mail Stop: <br />Phone: <br />Date: <br />Sheet <br />Varies b Disci line <br />Februar 21, 2017 <br />2 of 2 <br />Office: <br />Comments by: <br />Commenting Office & Mail Stop: <br />Commentor's Phone: <br />Date: <br />Everett <br />Building <br />February 24, 2017 <br /># <br />Sht/PgF <br />Reviewer's Comment <br />By <br />Designer's Response <br />Init. <br />windscreen will be transferred from the thickened <br />portion into the slab on grade. However, a calculation <br />was done assuming V beyond the thickened edge <br />contributes to overturning resistance and this pressure <br />is added to the spread footing pressure. The total <br />bearing pressure exerted by the spread footing, <br />including the surcharge, remains below the allowable <br />bearing pre sure. <br />4 <br />F1.05 <br />On detail C/F1.05, it appears that the bottom of <br />grander es <br />The thickened slab for the windscreen is detailed to <br />Otak <br />Detail C <br />the footing is less than the 18" frost depth <br />behave integrally with the slab on grade. The thickened <br />provided. Please adjust footing thickness and <br />portion is provided to facilitate installation of the anchors <br />depth as required to meet the 18" frost depth. <br />and it is not intended to function as a standalone footing. <br />Our intent is for it to be subject to the same <br />requirements as the slab -on -grade for frost depth <br />considerations. <br />Swift 11 BRT-Seaway TC Everett Comment Sheet_OtakResponse.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.