My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD 2022-05-13
>
Address Records
>
SEAWAY BLVD
>
7505
>
7505 SEAWAY BLVD 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 4:20:04 PM
Creation date
6/4/2020 10:42:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comment Response Matrix <br />Date <br />Commenter <br />Category <br />Comment <br />Response from: <br />Response <br />Response Date <br />1. Compliance with the energy code requires submittal of documents to indicate that lighting, <br />1/30/2017 <br />Meg Haley <br />General <br />mechanical heating and cooling, water heater insulation requirements, and prescriptive or other <br />Wood Harbinger <br />The energy compliance forms for the mechanical and lighting systems are submitted for review. <br />2/3/2017 <br />method of compliance for building enclosure has been met on the plans submitted for permit. <br />1/30/2017 <br />Meg Haley <br />1. Elevations of toilet room grab bars should be shown on the drawings to indicate fixture <br />IBI <br />Sheet A2.2 has been revised to show grab bars and toilet room accessories <br />2/9/2017 <br />locations, clearances, and heights, per IBC A117.1-2009 chapters 6 and 9 <br />1/30/2017 <br />Meg Haley <br />a. An elevation is required for the interior of the accessible stall of the men's and women's toilet <br />/ <br />IBI ;/ <br />Sheet A2.2 has been revised to show the interior elevations of the toilet stalls <br />2/9/2017 <br />room on the elevation identified as 3/A2.2. <br />b. Maneuverability clearances should be shown both inside and outside the toilet room <br />1/30/2017 <br />Meg Haley <br />Accessibility <br />entrances on the plans, with clearances required from obstacles like benches, per ICC-A117.1-2009 <br />IBI <br />Sheet A2.3 is revised to show required ADA access inside and outside of the rest rooms; the 5' diameter of clearance is <br />2/9/2017 <br />Figure 404.2.3.2©, which requires 5'-0" clear, and per ICC-A117.1-2009 section 603.2.1, where the <br />now shown within the room but outside of the toilet stalls. <br />required turning space should not be provided within the accessible stall. <br />1/30/2017 <br />Meg Haley <br />c. Insulation should be shown on exposed pipes in the new lavatory counters in the women's and <br />Wood Harbinger IBI <br />Insulation on the exposed pipes for the lavatories is addressed in the Paragraph 2.03.A of Section 200700 in the <br />2/3/2017 <br />men's rooms. <br />mechanical specification. A2.2 now includes notes about the required insulation for exposed pipes. <br />1/30/2017 <br />Meg Haley <br />d. Toilet room and break room sinks should be shown as 34 inches maximum in height, per ICC- <br />IBI <br />Sheet A2.2 has been revised to show this maxi <br />2/9/2017 <br />A117.1-2009 section 606.3. <br />1. Please indicate the prescriptive method of building envelope compliance, to include detailed R- <br />gs <br />1/30/2017 <br />Meg Haley <br />Values of new or modified exterior walls, roof -ceiling cavities, man -doors and garage doors, per <br />IBI <br />Provided on sheets A2.3 - A2.7 J�`J <br />2/14/2017 <br />WSEC section C402.1. <br />a. In addition to the prescriptive path, there is also a semi -heated path, which requires <br />j <br />1/30/2017 <br />Meg Haley <br />documentation on the plans for the intent for use and heating of the space in WSEC section <br />IBI <br />This is not asemi-heated building <br />2/9/2017 <br />C402.1.1.1. Additional details and calculations should be submitted for indicating compliance with <br />the code requirements of this section. <br />b. In addition to the prescriptive path, there is also a low energy path, which requires <br />1/30/2017 <br />Meg Haley <br />documentation on the plans for the intent for use and heating of the space per one of the four <br />IBI <br />This is not a low -energy building <br />2/9/2017 <br />options summarized in WSEC section C402.1.1. <br />2. Please indicate how the mechanical system will be used to condition the space: fully heated, <br />There is no semi -heated space in the building. All fully heated spaces will be heated by the electric unit heaters. The <br />1/30/2017 <br />Meg Haley <br />semi -heated. The mechanical permit application can be process simultaneously with the building <br />Wood Harbinger <br />exhaust and makeup air systems are provided for building ventilation. Refer to the attached Mechanical Energy <br />2/3/2017 <br />permit. <br />Compliance Form. <br />Energy <br />a. New mechanical systems and equipment servicing the building heating, cooling or ventilation <br />1/30/2017 <br />Meg Haley <br />needs, that are part of the addition, should be shown to comply with WSEC Section C403, per <br />Refer to the attached Mechanical Energy Compliance Form. <br />2/3/2017 <br />WSEC section C502.2.3. <br />See attached lighting fixture schedule with wattage. The following is the control narrative for the lighting system. a. <br />All lighting consist of LED luminaires. Interior lighting within the comfort station is controlled by local occupancy <br />3. Please indicate the lighting fixture schedule with wattage and control narrative, per WSEC <br />sensors. b. All exterior lighting is controlled by a centralized lighting control panel that automatically turns off the <br />1/30/2017 <br />Meg Haley <br />section C103.2. Interior and exterior lighting should be shown to comply with the requirements of <br />Wood Harbinger <br />lighting as a function of available daylight. c. All pole exterior lighting has an integral occupancy sensor to <br />2/3/2017 <br />WSEC section C405, per WSEC section C502.2.6. A form is available on the NEEC.net website. <br />automatically dim the luminaires to half lighting level if the area is not occupied. d. Lighting control of the shelters <br />consist of occupancy sensor control to automatically turn off the lighting is the space is not occupied. All shelter <br />lighting is controlled by a centralized lighting control panel that automatically turns off the lighting as a function of <br />available daylight. <br />4. Please include the interior lighting power compliance path for the interior and exterior of the <br />1/30/2017 <br />Meg Haley <br />building. The interior of the building is typically calculated by building area, space -by -space for the <br />Wood Harbinger <br />See attached interior/exterior lighting power compliance form. <br />2/3/2017 <br />lighting power allowance. A form is available on the NEEC.net website. <br />i <br />,� FEB 2 4 2017 <br />CITY OF EVERETT <br />Permit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.