My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 106TH ST SW 2022-08-29
>
Address Records
>
106TH ST SW
>
2320
>
2320 106TH ST SW 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 8:27:25 AM
Creation date
6/5/2020 10:53:24 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2320
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
override control.The override control Overload Heaters: installed on the discharge side of the <br /> also brings on the second pump inIf the Hydromatic electrical panel is check valve,so if necessary to service <br /> case of failure of the first pump. the check valve,the line pressure can <br /> not used,starters with 3-leg overload be cut off. Single pumpsystems are <br /> extra floats with appropriate controls g Y <br /> an be supplied for alarm functions. protection must be supplied.On sometimes installed without a check <br /> triplex systems use four controls: 3 phase pumps the heaters must valve,where it is desirable to self- <br /> one set at turn-off,one set at turn-on be sized in accordance with the drain the discharge line to prevent <br /> nameplate amps on the motor freezing.This can be done onlywith <br /> for one pump,one set at turn-on for <br /> housing.The amp draw on these short discharge lines,otherwise water <br /> two pumps,and one set at turn-on for <br /> submersible motors is slightly higher will return to the sum and cause <br /> three pumps.Pumps alternate each than a corresponding horsepower P <br /> successive cycle. short cycling of the pump. <br /> surface motor,so heaters must be <br /> Three pumps operate together only if sized by the nameplate rating. NEMA 4 Junction Box: (Optional) <br /> sump level rises to the fourth control Single phase pumps with capacitor If electrical control panel is to be <br /> (second override).This control also <br /> start have a run and a start winding; set remote from the pumpsum a <br /> brings on the third pump in case of each a different current.To p' <br /> failure of either or both of the first drawing NEMA 4 junction box should be <br /> adequately protect these windings used to make power and control <br /> two pumps. with the appropriate heaters,consult connections.The Hydromatic NEMA <br /> Alarm Controls: the factory. 4 junction box is provided with <br /> The alarm level is usually set above the NOTE:Red lead is always start compression connectors for sealing all <br /> override level so the alarm will signal winding of pump using single phase. wires.No sealing compound is needed <br /> only if the override level is exceeded. to make connections waterproof. <br /> However,some engineers prefer to Installation The size wire to use from panel to <br /> have the alarm level set below the sump depends on motor size and <br /> override level as it is possible for one Instructions distance in feet. <br /> pump to fail and the other pump to Installing Sump Level Control Be sure each wire is checked out so <br /> operate on the override level with the Float Controls: that a wrong connection will not be <br /> sump level never reaching the alarm made.An ohmmeter or Megger can be <br /> level.This is particularlytrue in cases In either simplex,duplex or triplex <br /> used to check wire continuity. <br /> if low inflow capacity. systems the lower or turn-off control <br /> is to be set to maintain a minimum Installing Float Switch Controls: <br /> electrical Control Panel: level in the sump.This level shall be <br /> no more than 3W' from the top of the The controls are supported by a <br /> It is recommended that the motor housing down to the surface mounting bracket that is attached to <br /> Hydromatic control panel be used of the sewage. sump wall or cover,or to the NEMA <br /> with all pumps,as proper starter 4 junction box. <br /> heaters,and connections for heat The second or turn-on control is set <br /> sensor wires are furnished. above the lower turn-off control.The Cord snubbers are used to hold the <br /> exact distance between the two floats cord in place. Control lever can be <br /> IMPORTANT: If Hydromatic must be a compromise between a changed at any time by loosening the <br /> electrical controls are not used and frequent pumping cycle(10 starts per snubber and readjusting cord length. <br /> the motor fails because of improper hour max.) to control septicity,solids In either simplex or duplex system <br /> components or if the heat sensors and a slower cycle for energy the lower or turn-off control is set <br /> are not properly connected,the economy.This distance should be just above the top of volute so that <br /> warranty is void. determined by the engineer or the volute will always be submerged <br /> consulting engineer,depending on during the pumping cycle.The <br /> Hydromatic electrical equipment the conditions of the application. second,or turn-on control,is set <br /> is installed in a weatherproof about 24 inches above the lower <br /> NEMA 3R enclosure.The electrical Installing Pump in Sump: turn-off control. <br /> equipment includes a main circuit Before installingin , <br /> breaker for each pump,a magnetic pump P sump, <br /> More distance between turn-on and <br /> starter with overload protection for lay it on its side and turn impeller turn-off controls can be used,but <br /> manually.Impeller may be slightly sewage maybecome septic and <br /> each pump,an H-O-A switch and stuck due to factorytest water,so it g P <br /> run light for each pump,an electric excessive solids may collect for <br /> alternator and a transformer to must be broken loose with small bar the pump to handle.A frequent <br /> provide appropriate control for control or screwdriver in edge of vanes.The pumping cycle is recommended <br /> circuit and alarms. impeller should turn freely. for best operation. <br /> Clean all trash and sticks from sump If an alarm system is used,this <br /> tower Cords: and connect pump to piping. control is usually set about 6 inches <br /> ''he power cord and heat sensor seal A check valve must be installed on above the override control.Some <br /> failure cord are potted into the each pump.A gate or plug valve in engineers,as described previously, <br /> connection box cap.The cords must each pump discharge line is also prefer to have the alarm control set <br /> not be spliced. recommended.This valve should be below the override control. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.