My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 106TH ST SW 2022-08-29
>
Address Records
>
106TH ST SW
>
2320
>
2320 106TH ST SW 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 8:27:25 AM
Creation date
6/5/2020 10:53:24 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2320
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 1.0 Introduction <br /> This Stormwater Pollution Prevention Plan (SWPPP) has been prepared as part of the <br /> NPDES stormwater permit requirements for the C and D Land Company project in <br /> Everett, Washington. The proposed site is located at 2320 - 106th Street S.W., Everett, <br /> Snohomish County, Washington. <br /> Construction activities will include the addition of one building, asphalt parking lots, <br /> landscaping, utility work, including power, telephone, gas, cable television, water, sewer, and <br /> storm appurtenances with catch basin collection, pipe conveyance, stormwater quality, and flow <br /> control facilities, etc. The purpose of this SWPPP is to describe the proposed construction <br /> activities and all temporary and permanent erosion and sediment control (TESC) <br /> measures, pollution prevention measures, inspection/monitoring activities, and <br /> recordkeeping that will be implemented during the proposed construction project. The <br /> objectives of the SWPPP are to: <br /> 1. Implement Best Management Practices (BMPs) to prevent erosion <br /> and sedimentation, and to identify, reduce, eliminate or prevent <br /> stormwater contamination and water pollution from construction <br /> activity. <br /> 2. Prevent violations of surface water quality, ground water quality, or <br /> sediment management standards. <br /> 3. Prevent, during the construction phase, adverse water quality <br /> impacts including impacts on beneficial uses of the receiving water <br /> by controlling peak flow rates and volumes of stormwater runoff at <br /> the Permittee's outfalls and downstream of the outfalls. <br /> This SWPPP was prepared using the Ecology SWPPP Template downloaded from the <br /> Ecology website. This SWPPP was prepared based on the requirements set forth in the <br /> Construction Stormwater General Permit, Stormwater Management Manual for Western <br /> Washington(SWMMWW 2005). The report is divided into seven main sections with several <br /> appendices that include stormwater related reference materials. The topics presented in the <br /> each of the main sections are: <br /> • Section 1 — INTRODUCTION. This section provides a summary <br /> description of the project, and the organization of the SWPPP document. <br /> ■ Section 2 —SITE DESCRIPTION. This section provides a detailed <br /> description of the existing site conditions, proposed construction activities, <br /> and calculated stormwater flow rates for existing conditions and <br /> post-construction conditions. <br /> • Section 3 — CONSTRUCTION BMPs. This section provides a detailed <br /> description of the BMPs to be implemented based on the 12 required <br /> elements of the SWPPP. <br /> 1 17576.003.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.