Laserfiche WebLink
Storm water Pollution Prevention Plan <br /> • Section 4 —CONSTRUCTION PHASING AND BMP IMPLEMENTATION. <br /> This section provides a description of the timing of the BMP <br /> implementation in relation to the project schedule. <br /> • Section 5 — POLLUTION PREVENTION TEAM. This section identifies <br /> the appropriate contact names (emergency and non-emergency), <br /> monitoring personnel, and the onsite temporary erosion and <br /> sedimentation control inspector <br /> • Section 6— INSPECTION AND MONITORING. This section provides a <br /> description of the inspection and monitoring requirements such as the <br /> parameters of concern to be monitored, sample locations, sample <br /> frequencies, and sampling methods for all stormwater discharge locations <br /> from the site. <br /> • Section 7 — RECORDKEEPING. This section describes the requirements <br /> for documentation of the BMP implementation, site inspections, <br /> monitoring results, and changes to the implementation of certain BMPs <br /> due to site factors experienced during construction. <br /> Supporting documentation and standard forms are provided in the following Appendices: <br /> Appendix A— Site Plans <br /> Appendix B—Construction BMPs <br /> Appendix C —Alternative BMPs <br /> Appendix D—General Permit <br /> Appendix E —Site Inspection Forms (and Site Log) <br /> Appendix F — Engineering Calculations <br /> 2 17576.003.doc <br />