My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 106TH ST SW 2022-08-29
>
Address Records
>
106TH ST SW
>
2320
>
2320 106TH ST SW 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 8:27:25 AM
Creation date
6/5/2020 10:53:24 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2320
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Storm water Pollution Prevention Plan <br /> 4.0 Construction Phasing and BMP <br /> Implementation <br /> The BMP implementation schedule will be driven by the construction schedule. The following <br /> provides a sequential list of the proposed construction schedule milestones and the <br /> corresponding BMP implementation schedule. The list contains key milestones such as wet <br /> season construction. <br /> The BMP implementation schedule listed below is keyed to proposed phases of the construction <br /> project, and reflects differences in BMP installations and inspections that relate to wet season <br /> construction. The project site is located west of the Cascade Mountain Crest. As such, the dry <br /> season is considered to be from May 1 to September 30 and the wet season is considered to be <br /> from October 1 to April 30. <br /> • Estimate of Construction start date: May 2016 <br /> • Estimate of Construction finish date: November 2016 <br /> • Mobilize equipment on site: <br /> • Mobilize and store all ESC and soil stabilization products <br /> (store materials on hand BMP C150): <br /> • Install ESC measures: <br /> • Install stabilized construction entrance: <br /> • Begin clearing and grubbing: <br /> • Temporary erosion control measures (hydroseeding): <br /> • Site inspections reduced to monthly: <br /> • Begin concrete pour and implement BMP C151: <br /> • Excavate and install new utilities and services (Phase 1): <br /> • Complete utility construction: <br /> • Begin implementing soil stabilization and sediment <br /> control BMPs throughout the site in preparation for wet <br /> season: <br /> • WET SEASON STARTS: October 1, 2016 <br /> 21 17576.003.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.