My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 106TH ST SW 2022-08-29
>
Address Records
>
106TH ST SW
>
2320
>
2320 106TH ST SW 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 8:27:25 AM
Creation date
6/5/2020 10:53:24 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2320
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 5.0 Pollution Prevention Team <br /> 5.1 Roles and Responsibilities <br /> The pollution prevention team consists of personnel responsible for implementation of the <br /> SWPPP, including the following: <br /> • Certified Erosion and Sediment Control Lead (CESCL) —primary <br /> contractor contact, responsible for site inspections (BMPs, visual <br /> monitoring, sampling, etc.); to be called upon in case of failure of any <br /> ESC measures. <br /> • Resident Engineer— For projects with engineered structures only <br /> (sediment ponds/traps, sand filters, etc.): site representative for the owner <br /> that is the project's supervising engineer responsible for inspections and <br /> issuing instructions and drawings to the contractor's site supervisor or <br /> representative <br /> • Emergency Ecology Contact—individual to be contacted at Ecology in <br /> case of emergency. Go to the following website to get the name and <br /> number for the Ecology contact information: <br /> http://www.ecy.wa.gov/org.html. <br /> • Emergency Owner Contact— individual that is the site owner or <br /> representative of the site owner to be contacted in the case of an <br /> emergency. <br /> • Non-Emergency Ecology Contact— individual that is the site owner or <br /> representative of the site owner than can be contacted if required. <br /> • Monitoring Personnel — personnel responsible for conducting water <br /> quality monitoring; for most sites this person is also the Certified Erosion <br /> and Sediment Control Lead. <br /> 22 17576.003.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.