Laserfiche WebLink
MCOB, PHASE II <br /> Calculation: C-2 Page 6 <br /> WEIR WALL HEIGHT <br /> CB 6: <br /> Not full flow <br /> Step 5 &6: use Flowmaster to fill in normal depth, critical depth,velocity head <br /> Step 7: Case B: EGLa< BOCo+dc;426.34<426.28+.28;426.34<426.56 <br /> Ho=0 <br /> EGLo=d+Velocity head+BOCo=.23+.19+426.28=426.7 <br /> HGLo=d+BOCo =0.23+426.28=426.51 <br /> Step 8: Case B flow is supercritical, continue to step 9 <br /> Step 9: set pipe loss to 0 <br /> Step 10: Set HGLi and EGLi and skip to step 15. <br /> Step 16: Check for supercritical flow; Set Eaio to zero,flow is supercritical <br /> Step 17, 18, 19: No benching, angles, or plunging <br />