My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7000 HARDESON RD Geotech Report 2022-10-25
>
Address Records
>
HARDESON RD
>
7000
>
Geotech Report
>
7000 HARDESON RD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:31:51 PM
Creation date
6/5/2020 2:03:52 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7000
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report <br /> Community Transit Merrill Creek Operating Base <br /> 7100 Hardeson Road <br /> Everett, Washington <br /> February 28, 2018 <br /> RN File No. 3224-002A <br /> Page 5 <br /> Resources Conservation Service (NRCS) to determine the erosion hazard of the on-site soils. <br /> The site surface soils were classified using the SCS classification system as 'Pits'. This unit <br /> consists of areas that have been excavated for sand or gravel. While a corresponding geologic <br /> unit for these soils is not noted, our site explorations encountered advance outwash sand and <br /> gravel. We expect the erosion hazard for the soil on the surrounding slopes to be moderate to <br /> severe depending on the slope inclinations. We have included the soil survey as Appendix A. <br /> Seismic Hazard: It is our opinion based on our subsurface explorations that the Soil Profile in <br /> accordance with the 2015. International Building Code (IBC) is Site Class D with Seismic Design <br /> Category D. We used the US Geological Survey program "U.S. Seismic Design Maps Web <br /> Application." The design maps summary report for the 2012/15 IBC is included in this report in <br /> Appendix B. <br /> Additional seismic considerations include liquefaction potential and amplification of ground <br /> motions by soft soil deposits. The liquefaction potential is highest for loose sand with a high <br /> groundwater table. The underlying dense outwash deposits are considered to have a very low <br /> potential for liquefaction and amplification of ground motion and seismically induced lateral <br /> spread. <br /> The project is mapped on Faults and Earthquakes in Washington State (Jessica L. Czajkowski <br /> and Jeffrey D. Bowman, USGS OFR 2014-05) as located in the Southern Whidbey island fault <br /> zone. This is a class A fault and is considered to have a low potential for surface displacement <br /> because of the thickness of the glacial overburden. The location of the fault zone is shown on <br /> the map in Appendix B. <br /> Site Preparation and Grading <br /> The first step of site preparation should be to strip the asphalt and loose fill soils to expose <br /> medium dense or firmer soils in pavement areas. Because the fill thickness ranges from about <br /> 14 to 19 feet in the pavement replacement areas, it is not feasible to completely remove all fill <br /> material. We therefore recommend approximately 2 feet of existing fill be removed from the <br /> underlying pavement. The excavated material should be removed from the site, or stockpiled <br /> for later use as landscaping fill. The resulting subgrade should be compacted to a firm, non- <br /> yielding condition. Areas observed to pump or yield should be repaired prior to placing hard <br /> surfaces. <br /> The on-site fill likely to be exposed during construction is considered moisture sensitive, and <br /> the surface will disturb easily when wet. We expect these soils would be difficult, if not <br /> impossible, to compact to structural fill specifications in wet weather. We recommend that <br /> earthwork be conducted during the drier months. Additional expenses of wet weather or winter <br /> construction could include extra excavation and use of imported fill or rock spalls. During wet <br /> weather, alternative site preparation methods may be necessary. These methods may include <br /> utilizing a smooth-bucket trackhoe to complete site stripping and diverting construction traffic <br /> around prepared subgrades. Disturbance to the prepared subgrade may be minimized by <br /> placing a blanket of rock spalls or imported sand and gravel in traffic areas. Cutoff drains or <br /> Robinson Noble, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.