My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7000 HARDESON RD Geotech Report 2022-10-25
>
Address Records
>
HARDESON RD
>
7000
>
Geotech Report
>
7000 HARDESON RD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:31:51 PM
Creation date
6/5/2020 2:03:52 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7000
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report <br /> Community Transit Merrill Creek Operating Base <br /> 7100 Hardeson Road <br /> Everett, Washington <br /> February 28, 2018 <br /> RN File No. 3224-002A <br /> Page 6 <br /> ditches can also be helpful in reducing grading costs during the wet season. These methods <br /> can be evaluated at the time of construction. <br /> Structural Fill <br /> General: All fill placed beneath buildings, pavements or other settlement sensitive features <br /> should be placed as structural fill. Structural fill, by definition, is placed in accordance with <br /> prescribed methods and standards, and is observed by an experienced geotechnical <br /> professional or soils technician. Field observation procedures would include the performance of <br /> a representative number of in-place density tests to document the attainment of the desired <br /> degree of relative compaction. <br /> Materials: Imported structural fill should consist of a good quality, free-draining granular soil, <br /> free of organics and other deleterious material, and be well graded to a maximum size of about <br /> 3 inches. Imported, all-weather structural fill should contain no more than 5 percent fines (soil <br /> finer than a Standard U.S. No. 200 sieve), based on that fraction passing the U.S. 3/4-inch sieve. <br /> The use of on-site soil as structural fill will be dependent on moisture content control. Some <br /> drying of the native soils may be necessary in order to achieve compaction. During warm, <br /> sunny days this could be accomplished by spreading the material in thin lifts and compacting. <br /> Some aeration and/or addition of moisture may also be necessary. We expect that compaction <br /> of the native soils to structural fill specifications would be difficult, if not impossible, during wet <br /> weather. <br /> Fill Placement: Following subgrade preparation, placement of the structural fill may proceed. <br /> Fill should be placed in 8-to 10-inch-thick uniform lifts, and each lift should be spread evenly <br /> and be thoroughly compacted prior to placement of subsequent lifts.All structural fill underlying <br /> building areas, and within a depth of 2 feet below pavement and sidewalk subgrade, should be <br /> compacted to at least 95 percent of its maximum dry density. Maximum dry density, in this <br /> report, refers to that density as determined by the ASTM D1557 compaction test procedure. Fill <br /> more than 2 feet beneath pavement subgrades should be compacted to at least 90 percent of <br /> the maximum dry density. The moisture content of the soil to be compacted should be within <br /> about 2 percent of optimum so that a readily compactable condition exists. It may be necessary <br /> to overexcavate and remove wet surficial soils in cases where drying to a compactable <br /> condition is not feasible. All compaction should be accomplished by equipment of a type and <br /> size sufficient to attain the desired degree of compaction. <br /> Temporary Slopes <br /> Temporary cut slope stability is a function of many factors, such as the type and consistency of <br /> soils, depth of the cut, surcharge loads adjacent to the excavation, length of time a cut remains <br /> open, and the presence of surface or groundwater. It is exceedingly difficult under these <br /> variable conditions to estimate a stable temporary cut slope geometry. Therefore, it should be <br /> the responsibility of the contractor to maintain safe slope configurations, since the contractor is <br /> continuously at the job site, able to observe the nature and condition of the cut slopes, and able <br /> to monitor the subsurface materials and groundwater conditions encountered. <br /> Robinson Noble, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.