My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 SEAWAY BLVD 2020-06-05
>
Address Records
>
SEAWAY BLVD
>
3315
>
3315 SEAWAY BLVD 2020-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 3:23:08 PM
Creation date
6/5/2020 3:18:13 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3315
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
critects <br /> October 22, 2018 <br /> Drew Martin, PE, SE <br /> Associate Engineer/Commercial Plans Examiner <br /> Permit Services <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> RE: TerraPower Phase 2 <br /> ADDRESS: 3315 Seaway Blvd., Bldg. A, Everett,WA 98203 <br /> PERMIT#: #1808012 <br /> Dear Mr. Martin: <br /> This letter is in response to the comments received from your office in a letter dated October 1, <br /> 2018, regarding TerraPower Phase 2 submittal <br /> Architectural <br /> General: <br /> Comment#1: <br /> It is understood per discussions with the project architect that the design for the area <br /> between Grids E.3-F.6/2.9-4.6 may be revised <br /> Sheet A2.3: Please find architectural and structural documentation for the area <br /> designated as TAT(rooms 127, 128, 129, and partially 130) and located between <br /> Grids E3-F6/2.9-4.6 included with the revised submittal. <br /> As per our email exchange,there may be a need for further equipment installation <br /> on the top of the TAT area. In addition to that, future needs may necessitate using <br /> part of that space as storage. Would that be the case, separate permit will be <br /> applied for. For that reason, and to lower cost of the future possible upgrade, the <br /> structure of the TAT has already been designed for 125 psf live load. Please see <br /> structural drawings and calculations. <br /> Comment#2: <br /> It is understood per discussions with the project architect that multiple additional <br /> mezzanines are planned in the areas currently designated as storage. <br /> Confirmed -TerraPower and Craft will continue working with city of Everett as the <br /> project unfolds. <br /> D Er:ENE:, <br /> 2505 Third Avenue, Suite 324 Seattle Washington 98121 Phone: 206.720.7001 F : 26/C7102244018 <br /> 018 <br /> CITY OF EVERETT <br /> Permit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.