Laserfiche WebLink
e • <br /> February 6, 2019 CitY of Everett WA D EL"-riS' VEM <br /> Public Works Department FEB 2( . 2019 <br /> 3200 Cedar Street Everett,WA 98201 _ <br /> CITY OF EVERETT <br /> ATT: Drew Martin permit Services <br /> RE: <br /> Seaway Center Mechanical Platform Everett,WA <br /> Plan Check Number: B1810-016, Second Review <br /> City Comment& Response <br /> Architectural: <br /> 3. The stairways appear to be only 30"wide, or less than the minimum 36"required by IBC <br /> Section 1011.2 Exception 1. We had previously discussed this in your email dated 12/11/18; my <br /> response on 12/12/18 confirmed the code requirement. We are inclined to not oppose the width <br /> shown in the drawings. However, the minimum width shall be specified, and a statement <br /> justifying the width shall be provided for our records. <br /> Response: The dimensions between grids A&B and 1&2 have been increased to 4'-0"to <br /> accommodate the 36" min width of stair. Correct callout of the 36"min stair width has been <br /> added on elevation 1 and 3 on S1.2 <br /> 4. Detail 6/S3.01 does not provide complete information for the construction of the railing. The <br /> detail shall be revised as follows: <br /> a. The detail specifies a maximum height of 42". The height shall be a minimum height. The <br /> height shall be measured from the walking surface. See IBC Section 1015.3. <br /> Response: The detail 6/S3.1 has been revised with correct callout. <br /> b. The detail shall specify intermediate railing such that a 21" diameter sphere cannot pass <br /> through the guard. See IBC Section 1015.4 Exception 3. <br /> Response: Detail 7/S2.1 has been added. <br /> c. The isometric view on Sheet S0.1 shows gaps between the railing and with the steel <br /> columns. The detail shall specify gaps to be less than 4". See IBC Section 1015.4. <br /> Response: Detail 7/S2.1 notes this maximum gap of 4" <br />