Laserfiche WebLink
f 19 <br /> SCOPE OF WORK (continued) <br /> • Conduct field survey including right-of-way; locate improvements not on record drawings or <br /> City records,obtain inverts,and other relevant topographic data to support project analyses, <br /> design and coordination with the property owner. <br /> Deliverables: The following deliverables will be prepared: <br /> • Survey data if required <br /> • Updated base map for expanded project area <br /> Assumptions: The following assumptions apply to this task: <br /> • Survey based on existing City controls. <br /> • Parking lot will be adequately accessible so that utility locating and survey can be completed <br /> in one trip. <br /> • City staff will be available to assist with temporary lane closures and opening existing <br /> drainage structures. <br /> • City will coordinate with property owner with supporting information by Parametrix <br /> regarding right-of-way and easement modifications and access for survey and construction. <br /> Task 4 Right-of-Way & Permits • <br /> Objective: Prepare legal descriptions and exhibits as noted below. <br /> Activities: The following activities are associated with this task: <br /> • Prepare legal descriptions and exhibits for new bioretention facility for permanent <br /> construction,permanent maintenance access and temporary construction staging and <br /> access. <br /> • Prepare legal descriptions and exhibits for retrofitting the existing swale for permanent <br /> construction, permanent maintenance access and temporary staging and access. <br /> Deliverables: The following deliverables will be prepared: <br /> • Legal descriptions for permanent bioretention facility and permanent access for <br /> maintenance; <br /> • Exhibits for temporary access and temporary staging during construction of the new <br /> bioretention facility. <br /> • Legal descriptions for retrofitting the existing swale and permanent access for maintenance; <br /> • Exhibits for temporary access and temporary staging during construction of the swale <br /> retrofit. <br /> Assumptions: The following assumptions apply to this task: <br /> • The City will acquire right-of-way. <br /> City of Everett 556-1844-007(01/09) <br /> Evergreen Way Water Quality Retrofit 2 August 201— <br /> Scope Amendment 1 <br /> 117 <br />