My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/12/24 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/12/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 10:53:54 AM
Creation date
6/10/2020 10:49:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/24/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> SCOPE OF WORK (continued) <br /> • 30%cost estimate <br /> • Outline specifications <br /> Assumptions: The following assumptions apply to this task: <br /> • The retrofit design for the existing swale will not be required for inclusion in the Final Pre- <br /> design Report for the Ecology LID grant-funded portion of the project. <br /> Task 7 90% Design <br /> Objective: To prepare a 90%design package for review by City for retrofitting the existing swale. <br /> Activities: The following activities are associated with this task: <br /> • Prepare 90%plans,specifications and estimate <br /> • Conduct an independent constructability review <br /> Deliverables: The following deliverables will be prepared for retrofitting the existing swale: <br /> • Constructability Review Memorandum <br /> • 90%Plans <br /> • 90%Specifications <br /> • 90%Cost Estimate <br /> Assumptions: The following assumptions apply to this task: <br /> • A 60%submittal will not be prepared. <br /> • The 90%design will not be required for inclusion in the Final Pre-design Report for the <br /> Ecology LID grant-funded portion of the project. <br /> Task 8 Final Bid Documents <br /> Objective: To prepare final bid documents and advertisement to be used by the City that includes both the <br /> bioretention facility and retrofitting the existing swale. <br /> Activities: The following activities are associated with this task: <br /> • Prepare final plans, specifications and cost estimate ready for bidding that incorporates input <br /> from the City and the manufacturer for retrofitting the existing swale. <br /> Deliverables: The following deliverables will be prepared for retrofitting the existing swale: <br /> • Final Plans <br /> • Final Specifications <br /> • Final Cost Estimate <br /> Assumptions: The following assumptions apply to this task: <br /> City of Everett 555-1844-007(01/09) <br /> Evergreen Way Water Quality Retrofit 4 August 2014 <br /> Scope Amendment 1 <br /> 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.