Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Award construction contract Consent COUNCIL BILL# <br /> and authorize the Mayor to X Action Originating Department Public Works <br /> sign the contract with First Reading Contact Person Peter Berger <br /> Blackwater Marine,LLC. for Second Reading Phone Number (425) 257-8858 <br /> the Lake Chaplain South Dam Third Reading FOR AGENDA OF Dec 24,2014 <br /> Tunnel Decommissioning Public Hearing <br /> Project Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) <br /> Approval <br /> 6133 Lake Chaplain Summary of bid PW <br /> Road, Sultan, WA tabulations. <br /> Amount Budgeted $565,000.00 <br /> Expenditure Required $432,237.21 Account Number(s): UP 3585 <br /> Budget Remaining $56,152.79 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> On November 25,2014,2 project bid proposals were received for construction of the Lake Chaplain South <br /> Dam Tunnel Decommissioning Project. The bids,which include sales tax,range from a low bid of <br /> $432,237.21 to a high bid of$532,700.63.The Engineer's estimate,including sales tax,was$547,976.34. An <br /> evaluation of the low bid proposal from Blackwater Marine,LLC. was found to meet all contract bidding <br /> requirements; therefore the City recommends that Blackwater Marine, LLC be awarded the construction <br /> contract for the Lake Chaplain South Dam Tunnel Decommissioning Project for the amount of$432,237.21. <br /> Previously authorized expenditures for the project include $74,610 for design services through award of <br /> contract and$2,000 for advertising the call for construction bids. Total expenditures requested to date, <br /> including this request for construction award, are $508,847.21. The budget remaining is $56,152.79. <br /> RECOMMENDATION: <br /> Award construction contract and authorize the Mayor to sign the contract with Blackwater Marine, LLC for <br /> the Lake Chaplain South Darn Tunnel Decommissioning Project in the amount of$432,237.21,including <br /> Washington State sales tax. <br /> 33 <br />